Work must be substantially complete within 90 days and fully completed within 120 days of the Notice to Proceed. Bidders must be DCAM-certified in Water and Sewerage Treatment Facilities and submit a current DCAM Certificate of Eligibility and signed DCAM Update Statement (Form CQ 3). A 5% bid deposit is required. The successful bidder must provide 100% Performance and Payment Bonds. Bids are due December 18, 2026, at 2:00 PM at the Ayer DPW Office, 25 Brook Street, Ayer, MA 01432. Electronic contract documents are available starting November 18, 2026.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 18, 2026
- Time stated in bid documents
- Dec 18, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 2 published · 1 analyzed
Scope of work
- Replace Anthracite coal, GreensandPlus™, and gravel support filter media
- Rehabilitate six (6) existing greensand pressure filters
Steps to Bid
- 1
Review the full contract documents, including specifications, drawings, and addenda, available at Official linkPro starting November 18, 2026. was Nov 18, 2026, 8:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Ensure DCAM certification in Water and Sewerage Treatment Facilities and obtain a current DCAM Certificate of Eligibility and signed DCAM Update Statement (Form CQ 3).
- 3
Submit a bid deposit of at least 5% of the highest possible bid amount (including all alternates). by Dec 18, 2026, 2:00 PM
What you'll need
Contract duration
90 consecutive calendar days to substantial completion; 120 consecutive calendar days to full completion from the Notice to Proceed.
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes removal and replacement of Anthracite coal media, GreensandPlus™ filter media, and gravel support media. A bid deposit of at least 5% of the highest possible bid amount (including all alternates) is required. The contract is subject to M.G.L. Electronic contract documents are available at [link available with Pro] beginning November 18, 2026.
Key dates
- Site visit
- Dec 18, 2026, 2:00 PM Eastern Time
- Bids due
- Dec 18, 2026
Documents
- ADVERTISEMENT_5.pdf2 pages
- bidDetail.sda
More from this agency
- Fitchburg Road Sewer Main Extension – Phase 1 Project · closes Dec 11, 2026
Similar bids in Massachusetts
- Municipal Vulnerability Preparedness (MVP) Planning 2.0 FY27 · closes Dec 11, 2026
- Buzzards Bay Watershed Infrastructure and CCMP Support Grant Program FY2027 · closes Dec 8, 2026
- Purchase and Delivery of Methanol – SP24-Methanol-T01 · closes Apr 13, 2029
- Request for Qualifications: Contractor Prequalifications for 1.3 MGD PFAS Water Treatment Facility
- Pond Street Water Treatment Plant Underdrain Replacement · closes Dec 3, 2026
Closing soon in Massachusetts
- Request for Qualifications for 15 Trade Contractor Packages: Masonry, Iron, Waterproofing, Roofing, Glass, Plastering,… · closes Dec 1, 2026
- Gate Valves · closes Dec 3, 2026
- On-call Routine and Emergency HVAC Maintenance and Repair Services at Five Affordable Housing Developments — Medford… · closes Dec 3, 2026
- Request for Letters of Interest — Design-Build Services for Green Line B Branch Short Term Accessibility Station… · closes Dec 4, 2026
- RFQ for General Contractor and Subcontractor Services · closes Dec 4, 2026