Replacement of HVAC Controls at Stilson Elementary, Langston Chapel Elementary, and Langston Chapel Middle Schools
Bulloch County SchoolsStatesboro, Georgia#FY2027-PH3 HVAC
Bulloch County Schools is seeking proposals to replace HVAC controls at three schools: Stilson Elementary, Langston Chapel Elementary, and Langston Chapel Middle. Work includes new control devices, ethernet cabling, server provision, peak demand limiting, adjustable setpoints, full system commissioning, scheduling, remote control, alarm trending, and 8 hours of training. Only Siemens, Carrier iVu, or Trane systems are acceptable. Proposals must include a separate bid amount per site. A 5% bid bond per location and 100% performance and payment bonds are required. Proposals must be sealed, delivered or mailed to Ryan Macy at 219 Simons Road, Statesboro, GA 30458, by December 17, 2026, at 2:00 PM ET. Site visits are optional but recommended and can be scheduled between November 9 and December 11, 2026. BCS may reject any or all proposals.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 17, 2026
- Time stated in bid documents
- Dec 17, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 1
Scope of work
- Install new control devices and ethernet cabling throughout all buildings
- Provide server if necessary and implement peak demand limiting
- Enable adjustable setpoint control and customizable scheduling
- Support individual and universal HVAC control and remote access
- Trend HVAC function and alarms to detect malfunctions
Steps to Bid
- 1
Schedule a site visit (optional but highly recommended) between November 9 and December 11, 2026, by contacting Ryan Macy at 912.601.4210 or [email available with Pro]. by Dec 11, 2026, 2:00 PM
- 2
Submit all questions in writing via email to Ryan Macy ([email available with Pro]) by December 10, 2026, to allow time for responses before the proposal deadline. by Dec 10, 2026, 2:00 PM
- 3
Prepare a sealed proposal package including the completed Contract Agreement form, a separate bid amount for each school location, and all required documentation. by Dec 17, 2026, 2:00 PM
- 4
Ensure the bid bond (5% of the full bid amount per location) is included with the proposal. by Dec 17, 2026, 2:00 PM
- 5
Deliver or mail the sealed proposal to Ryan Macy, Director of Facilities Management, at 219 Simons Road, Statesboro, GA 30458, by December 17, 2026, at 2:00 PM ET. by Dec 17, 2026, 2:00 PM
What you'll need
Contract duration
No later than July 16, 2026
Submission
Mail, Hand delivery
NAICS
336115, 541611
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bulloch County Schools (BCS) is soliciting proposals for the replacement of existing heating, ventilation, and air-conditioning (HVAC) controls at three school facilities: Stilson Elementary School (15569 State Rte 119C, Brooklet, GA 30415), Langston Chapel Elementary School (150 Langston Chapel Road, Statesboro, GA 30458), and Langston Chapel Middle School (156 Langston Chapel Road, Statesboro, GA 30458). The scope includes furnishing and installing new control devices, providing a server if necessary, installing ethernet cabling throughout all buildings, implementing peak demand limiting, enabling adjustable setpoint control, performing full system commissioning with 100% device testing and point-to-point verification, supporting customizable scheduling, enabling individual and universal HVAC control, trending HVAC function and alarms, and providing up to 8 hours of training to BCS staff. All work must be completed no later than July 16, 2026, with preferred work windows during school breaks: April 3–11, 2027, and May 30–July 12, 2027. Performance and payment bonds of 100% of the contract sum are required. Proposals must be submitted in a sealed envelope labeled 'HVAC Controls Projects' and delivered or mailed to Ryan Macy, Director of Facilities Management, at 219 Simons Road, Statesboro, GA 30458. Bids will be opened publicly at 2:10 PM on the same day. Site visits are optional but highly recommended and may be scheduled between November 9 and December 11, 2026, by contacting Ryan Macy at 912.601.4210 or [email available with Pro]. The evaluation will be based on 70 points for cost, 20 points for technical compliance, 5 points for warranty, 2.5 points for training, and 2.5 points for bid bond submission.
Key dates
- Questions due
- Dec 10, 2026, 2:00 PM Eastern Time
- Site visit
- Dec 11, 2026, 2:00 PM Eastern Time
- Bids due
- Dec 17, 2026
Documents
- HVACControlsPH31.pdf10 pages
More from this agency
- Various Roof Replacements and Repairs at Three Schools — closes Dec 1, 2026
- Food Service Facility Roof Replacement — closes Dec 1, 2026
- Interactive Flat Panels for Bulloch County Schools — closes Dec 1, 2026
Similar open bids
- Lambdin Hall Chiller Replacement at Gordon State College — Gordon State College
- Camden Campus HVAC Pump Replacements — College Of Coastal Georgia
- RFP2027-01 - HVAC City of Duluth — Duluth, City Of
- Self-Contained Breathing Apparatus (SCBA) Systems for Brooks County Fire Rescue — Brooks County Board Of Commissioners
- Sequoyah Middle School HVAC Replacement, Project No. 2027-02 — Clayton County Board Of Education
Closing this week nearby
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Resurface & Maintenance of SR 216 from SR 45 to SR 37 — closes Nov 20, 2026
- ADDENDUM NO. 1 – EXTENSION OF PROPOSAL DEADLINE — RFP 2026-03: Playground Equipment, Safety Surfacing, Delivery and… — closes Nov 20, 2026
- Playground Equipment, Safety Surfacing, Delivery and Installation — RFP No. 2026-03 — closes Nov 20, 2026