OpenConstructionCloses Dec 15, 2026, 11:59 PM CT

HMA Resurfacing/Heater Scarification on IA 149 in Wapello County

Iowa DOT — Iowa DOT - Office of ContractsWapello, Iowa#90-1491-100

Iowa DOT is seeking bids for HMA Resurfacing and Heater Scarification on IA 149 in Wapello County. The project spans 4.31 miles, from approximately 1.1 miles north of US 63 to 0.4 miles south of IA 23. The estimated letting date is December 15, 2026. Plans and proposals are not yet available. The bid number is 90-1491-100.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 15, 2026, 11:59 PM CT
Time stated in bid documents
Dec 15, 2026, 11:59 PM Central Time
Documents analyzed
3 published · 1 analyzed

Scope of work

  • Location: Approx 1.1 mi N of US 63 to 0.4 mi S of IA 23
  • Length: 4.31 miles

Steps to Bid

  1. 1

    Review project details and specifications when available.

    Plans and proposals are not currently available.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The phase number is STP-149-1(100)--2C-90, and the expected proposal ID is 90-1491-100.

Key dates

Bids due
Dec 15, 2026, 11:59 PM CT

Documents

  • Estimated-Project-Letting-Dates.pdf62 pages
  • 15DEC160.zip
  • 160_90-1491-100_E_Files__Road_.zip

See all documents · Download with Pro

More from this agency

Similar bids near Wapello

Closing soon near Wapello