OpenIFBCloses Dec 2, 2026, 2:00 PM CT

Holder Door 100 Degree Swing 2

Dallas Area Rapid TransitTexas#2101953

Dallas Area Rapid Transit is soliciting bids for a 100-degree swing holder door. Freight must be FOB Destination with cost included. Delivery on time is mandatory. Invoices must be submitted in triplicate to [email available with Pro] and include full order details. Payment is net 30 days. Failure to perform may result in termination for default.

On PublicBidSearch: the original bid posting for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 2, 2026, 2:00 PM CT
Time stated in bid documents
Dec 2, 2026, 2:00 PM Central Time
Submission
electronic portal

Scope of work

  • Supply one 100-degree swing holder door
  • Delivery at specified time and rate is mandatory

Steps to Bid

  1. 1

    Initiate the 'Prepare Your Submission' process on the Bonfire portal.

  2. 2

    Access the in-browser BidTable window and locate the vendor response fields.

  3. 3

    Submit your bid through the Bonfire portal by the due date and time. by Dec 2, 2026, 2:00 PM

What you'll need

Submission

Electronic portal

How to submit

Submit via the Bonfire portal. Access the 'Prepare Your Submission' process and complete the in-browser BidTable. No physical submission required.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Freight terms require FOB Destination with freight cost included in the bid price; FOB Origin or Prepay and Add terms are not accepted. Invoices must be submitted in triplicate (one marked 'Original') to [email available with Pro] and include: purchase order number, item number, description, sizes, quantities, unit prices, and extended totals. Payment is made 30 days after invoice receipt or 30 days after order receipt, whichever is later, unless otherwise agreed in writing. The Contracting Officer may terminate the order for default if the seller fails to perform within specified timeframes. In such case, the seller is liable for damages, including excess reprocurement costs. Termination may be deemed for convenience if the failure was not due to the seller's fault or control. 'Subcontractor' includes vendors and suppliers at any level.

Key dates

Questions due
Nov 30, 2026, 2:00 PM Central Time
Bids due
Dec 2, 2026, 2:00 PM CT

More from this agency

Similar bids in Texas

Closing soon in Texas