OpenIFBCloses Nov 30, 2026, 2:00 PM CT

BPO for Bucket Truck Modification

Dallas Area Rapid TransitTexas#Req #2098180

Dallas Area Rapid Transit is soliciting bids for modifications to bucket trucks. Payment is net 30 days. The contract may be terminated for default or convenience.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 30, 2026, 2:00 PM CT
Time stated in bid documents
Nov 30, 2026, 2:00 PM Central Time
Submission
electronic portal

Scope of work

  • Modify bucket trucks for enhanced performance and safety
  • Upgrade electrical and hydraulic systems
  • Perform safety and compliance inspections
  • Ensure FOB Destination shipping terms with freight included
  • Deliver modifications on time and at agreed rate

Steps to Bid

  1. 1

    Register on Bonfire and initiate the 'Prepare Your Submission' process.

  2. 2

    Access the in-browser BidTable window and locate the vendor response fields.

  3. 3

    Submit the bid via the Bonfire portal by the due date and time. by Nov 30, 2026, 2:00 PM

What you'll need

Submission

Electronic portal

How to submit

Submit via the Bonfire portal after initiating the 'Prepare Your Submission' process. Access the in-browser BidTable window to enter vendor responses. All documents must be reviewed and downloaded from the 'Supporting Documentation' section before submission.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The complete PO Terms and Conditions PDF is available for download in the 'Supporting Documentation' section. Freight terms require FOB Destination with freight cost included in the overall price; FOB Origin or Prepay and Add terms are not accepted. Termination for convenience may apply if failure is not due to the seller's fault or control, or if the failure is beyond the seller's and subcontractors' control, fault, or negligence. Subcontractors include vendors and suppliers at any level.

Key dates

Questions due
Oct 9, 2026, 2:00 PM Central Time
Bids due
Nov 30, 2026, 2:00 PM CT

More from this agency

Similar bids in Texas

Closing soon in Texas