I-15; 7200 S to 5300 S – Rehabilitation High Volume Construction Project
Utah Department of Transportation — UDOTSalt Lake, Utah#F-I15-7(392)298
Scope includes full-depth and partial-depth concrete repairs, crack sealing, pavement grinding, traffic control, barrier repair, and application of epoxy and thermoplastic pavement markings. Coordination with Union Pacific Railroad and Utah Transit Authority is required. The project is a P+T (Price + Time) contract with no retention. Prequalification is mandatory. Davis-Bacon wages apply.
Awarded to WHITAKER CONSTRUCTION COMPANY INC.
On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Nov 18, 2026
- Submission
- electronic portal
- Contract term
- To be determined by competitive bidding
- Documents analyzed
- 8 published · 3 analyzed
Scope of work
- Full-depth slab replacement, rapid set, half panel: 2,296 sq yd
- Full-depth slab replacement, rapid set, full panel: 960 sq yd
- Partial depth repair for concrete pavement: 2,113 sq ft
- Crack sealing: 6,934 ft
- Pavement grinding: 269,363 sq yd
- Pavement marking with epoxy: 54,785 ft (white), 52,513 ft (yellow)
Steps to Bid
- 1
Register with UDOT and complete prequalification application
- 2
Obtain project plans, specifications, and addenda from UDOT's Project Development Construction Bid Opening Information website
What you'll need
Prequalification
RequiredContract duration
To be determined by competitive bidding
Submission
Electronic portal
NAICS
237130
Get alerts for bids like this
New pavement marking and striping bids in Utah
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Bid opening scheduled for November 17, 2026, at 2:00 p.m. MT. Prequalification required. Engineer's estimate: greater than $10M but less than or equal to $15M.
Documents
- F-I15-7_392_298_Adv_Set.pdf
- F-I15-7_392_298_NTC.pdf3 pages
- project-files
- F-I15-7_392_298_items.pdf3 pages
- F-I15-7_392_298__Ad1.pdf16 pages
- bvi-documents
- unofficial-bid-results
- abstract
More from this agency
- UDOT Region 1 Saleratus Creek Mitigation Site · closes Dec 1, 2026
- UDOT IFB- Group B Signs- UDOT Regions 1, 2, 3 · closes Dec 1, 2026
- UDOT RFSQ/AVL- Concrete Repair- Stage 1- Qualification/Re-Qualification · closes Dec 4, 2026
- Janitorial Services for Echo Port of Entry · closes Dec 4, 2026
- I-15; South Cedar Interchange & Widening · closes Dec 9, 2026
Closing soon near Salt Lake County
- 26-27 System Maintenance Critical Parts · West Jordan · closes Dec 2, 2026
- 26-27 Pipeline Maintenance Airvac Critical Parts · West Jordan · closes Dec 2, 2026
- Midvale Campus Renovation General Contractor Selection Stage 2 - CONST (Invitation Only) · Midvale · closes Dec 3, 2026
- Transmission Repair/Replacement for Two ADA-Compliant Vans – VA Salt Lake City Medical Center · Salt Lake City · closes Dec 4, 2026
- Wes Valley City Tow Rotation RFQ · West Valley City · closes Dec 4, 2026