This is an Invitation for Bids (IFB) managed via COMMBUYS. The switchboards must be delivered by September 2, 2027, to 100 Foodmart Road, Boston, MA 02118.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 10, 2026
- Time stated in bid documents
- Dec 10, 2026, 2:00 PM Eastern Time
- Submission
- electronic portal
- Documents analyzed
- 3
Scope of work
- Furnish three (3) Distribution Switchboards (YP-SB41, YP-SB42, YP-SB43).
- Switchboards must meet NEMA PB-2, UL 891, and NEC standards.
- Supplier responsible for submittals, delivery coordination, and purchase process support.
- No installation required by the supplier.
Steps to Bid
- 1
Review all solicitation documents thoroughly.
Bidder shall review and study all documents thoroughly and report any discrepancies, omissions, technical queries, or other clarifications via COMMBUYS.
- 2
Submit questions and clarification requests via COMMBUYS. by Dec 3, 2026
Questions and clarification requests submitted by Bidder will, together with MBTA’s response be made available to all Bidders via COMMBUYS. Such comments and questions may be submitted up to one week prior to the due date listed in Section 2.3.
- 3
Submit bid electronically via COMMBUYS. by Dec 10, 2026, 2:00 PM
Bids are due by: 12/10/2026 at 2:00 PM, EST / EDT. Bidder is required to prepare and submit all required documents to MBTA electronically via COMMBUYS.
What you'll need
Contract duration
Delivery: By September 2, 2027
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Furnishing of three (3) Distribution Switchboards (YP-SB41, YP-SB42, & YP-SB43) in accordance with specification document no. 16470P. The switchboards shall be completely metal enclosed, self-supporting, dead front, free standing, circuit breaker type for indoor service, conforming to NEMA Standards No. PB-2, UL Standard No. 891, and the NEC. Enclosure frame and interior barriers shall be fabricated of not less than 11-gauge steel. Construction shall prevent entry of rodents. Switchboards shall be completely assembled, wired and tested at the manufacturer's plant. The supplier is responsible for coordinating submittals, delivery, and providing support through the purchase process. The contract is for furnishing only; no installation is required by the supplier.
Key dates
- Questions due
- Dec 3, 2026
- Bids due
- Dec 10, 2026
Documents
- IFB-159-26-COMMBUYS_Bid_Document.pdf28 pages
- IFB-159-26-Specification.pdf22 pages
- 3._MBTA_Minimum_Insurance_Requirements_SAVE_AS_.dotm
More from this agency
- Installation and Services of 2 Uninterrupted Power Supply Units, RFP 130-26 — closes Nov 25, 2026
- Request for Qualifications: Trade Contractor MBTA – Newtonville Commuter Rail Station Accessibility Improvements — closes Nov 30, 2026
- RFP 112-26 Centralized Train Control System — closes Nov 30, 2026
- Switch Point Stock Rail and Frogs – IFB 152C-26 — closes Dec 1, 2026
- RFP 149-26 Emergency Generator Maintenance — closes Dec 2, 2026
Similar open bids
- KHA Switchboard Replacement – Project #145042 — Kingston Housing Authority
- On-Call Electrical Services — Town of Needham
- Switchboard Replacement at Meadowcrest, Kingston, MA (Project #145042) — Plymouth Housing Authority
- On-Call Electrical Response and Repair Services for Public Housing Developments — New Bedford Housing Authority
Closing this week nearby
- Multifunction Device Procurement — closes Nov 20, 2026
- Window Replacement at Beaudry-Boucher Apartments, 68 Cabot St, Holyoke, MA — closes Nov 20, 2026
- Installation and Construction of Backup Generator at Cambridge Community Center – Reilience Hub Project — closes Nov 20, 2026
- Food Service Equipment for Natick, MA — closes Nov 23, 2026
- Process Server — closes Nov 23, 2026