OpenConstructionCloses Dec 4, 2026, 10:00 AM CT

Installation of signals on S.R. 25 (Dixon Springs Highway) at the intersection of Industrial Drive in Carthage - Smith County

Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN263083

The project is 0.070 miles in length and must be completed by April 30, 2028. Bids must be submitted electronically via the Bid Express portal by 10:00 A.M. Central Time on December 4, 2026. Contractors must also be in good standing with the Tennessee Secretary of State. A bid bond of 5% of the bid amount is required. The full bid package, including plans and specifications, is available on the TDOT website.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 4, 2026, 10:00 AM CT
Time stated in bid documents
Dec 4, 2026, 10:00 AM Central Time
Bid bond
5%
Submission
internet
Documents analyzed
2
Required submission items
2 items · full checklist with Pro

Scope of work

  • Install traffic signals at S.R. 25 (Dixon Springs Highway) and Industrial Drive intersection
  • 0.070 miles of signal installation work
  • Electronic bid submission via Bid Express portal

Steps to Bid

  1. 1

    4

    Verify your business is in good standing with the Tennessee Secretary of State. If not, your bid will be rejected.

What you'll need

Contract duration

On or before April 30, 2028

Submission

Internet

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Contract No. CN263083, Call No. 053 - Smith County Project No. CRP-25(68), 80S025-F3-002 (PIN 134182.28): The installation of traffic signals on S.R. 25 (Dixon Springs Highway) at the intersection of Industrial Drive (L.M. 10.15) in Carthage, Smith County, Tennessee. Completion time: On or before April 30, 2028. Internet bidding is mandatory. Bidders must obtain bid authorization by 4:00 P.M. Central the day before the letting.

Key dates

Questions due
Dec 3, 2026, 4:00 PM Central Time
Pre-bid meeting
Nov 17, 2026, 1:00 PM Central Time
Bids due
Dec 4, 2026, 10:00 AM CT

Documents

  • 20261204_NoticeToContractors.pdf14 pages
  • 20261204_InstructionsToBidders.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids in Tennessee

Closing soon in Tennessee