Resurfacing on U.S. 11 (U.S. 41, S.R. 2) from south of I-24 to U.S. 11 (S.R. 2) and Related Roadwork in Hamilton County
Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN262074
11 (U.S. 41, S.R. 2) from south of I-24 to U.S. 11 (S.R. 2), S.R. 8 from West Main Street to Market Street in Chattanooga, S.R. 17 from U.S. 11 to S.R. 8, and S.R. 316 from near Chestnut Street to near S.R. 8 in Hamilton County. The total contract length is 1.250 miles. Work must be completed by October 31, 2027. Bids are due via the internet (Bid Express) at 10:00 A.M. Central on December 4, 2026. Internet bidding is mandatory. Bidders must obtain bid authorization by 4:00 P.M. Central the day before the letting. Contractors must be in good standing with the Tennessee Secretary of State. Failure to be in good standing within 21 days after proposal opening will result in the proposal being rejected. The bid must be accompanied by an electronic bid bond in an amount equal to at least 5% of the bid amount. The Department will not execute contracts with corporations, LLCs, LPs, or LLPs that are not in good standing with the Secretary of State.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- internet
- Documents analyzed
- 2
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Resurface 0.220 miles of U.S. 11 from south of I-24 to U.S. 11 (S.R. 2)
- Resurface 0.640 miles of S.R. 8 from West Main Street to Market Street in Chattanooga
- Resurface 0.320 miles of S.R. 17 from U.S. 11 to S.R. 8
- Resurface 0.070 miles of S.R. 316 from near Chestnut Street to near S.R. 8
Steps to Bid
- 1
Obtain bid authorization via the Bid Express website by 4:00 P.M. Central the day before the letting. by Dec 3, 2026, 4:00 PM
- 2
Download the Proposal Contract, Plans, and Specifications from the TDOT Construction Division website.
- 3
Submit the bid via the internet (Bid Express) by 10:00 A.M. Central on December 4, 2026. by Dec 4, 2026, 10:00 AM
- 4
Submit the electronic bid bond in an amount equal to at least 5% of the bid amount. by Dec 4, 2026, 10:00 AM
What you'll need
Contract duration
On or before 10/31/2027
Submission
Internet
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Contract No. CN262074, Call No. 020 - Hamilton County Project No. NH/HSIP-2(310), 33S002-F8-012 (PIN 137179.00), 33S002-F3-014 (PIN 137179.00): The resurfacing on U.S. 11 (U.S. 41, S.R. 2) from south of I-24 (L.M. 7.19) to U.S. 11 (S.R. 2) (L.M. 7.71). Project No. NH/HSIP-8(73), 33S008-F8-008 (PIN 136551.00), 33S008-F3-008 (PIN 136551.00): The resurfacing on S.R. 8 from West Main Street (L.M. 8.33) to Market Street (L.M. 8.97) in Chattanooga. Project No. NH/HSIP-17(44), 33S017-F8-005 (PIN 136552.00), 33S017-F3-005 (PIN 136552.00): The resurfacing on S.R. 17 from U.S. 11 (U.S. 64, S.R. 2) (L.M. 2.22) to S.R. 8 (L.M. 2.54). Project No. NH-316(1), 33S316-F8-001 (PIN 137178.00): The resurfacing on S.R. 316 from near Chestnut Street (L.M. 0.16) to near S.R. 8 (L.M. 0.23). Completion Time - On or before 10/31/2027.
Key dates
- Questions due
- Dec 3, 2026, 4:00 PM Central Time
- Pre-bid meeting
- Nov 19, 2026, 11:00 AM Central Time
- Bids due
- Dec 4, 2026, 10:00 AM CT
Documents
- 20261204_NoticeToContractors.pdf14 pages
- 20261204_InstructionsToBidders.pdf4 pages
More from this agency
- Resurfacing on S.R. 68 from the Meigs County line to east of County Road 286 - McMinn County · closes Dec 4, 2026
- Resurfacing on U.S. 231 (S.R. 10) from near Cedar Forest Road to near U.S. 70 (S.R. 24, West Main Street), including… · closes Dec 4, 2026
- Drain Cleaning on Various Interstate and State Routes - Hamilton County · closes Dec 4, 2026
- Drain Cleaning on Various Interstate and State Routes — Blount, Campbell, Knox, Loudon, and Roane Counties · closes Dec 4, 2026
- Grading, drainage, construction of a welded steel girder bridge, lighting and signals, ITS, and paving on I-40 at… · closes Dec 4, 2026
Similar bids in Tennessee
- Modernization of Frederick W. Smith International Airport Terminal — Request for Proposals · closes Jan 22, 2027
- Educational Greenhouse Construction and Installation at Scotts Hill High School
- New Welcome Center · closes Dec 17, 2026
- Emergency Response Fire Pumper
- Garage Doors · closes Dec 16, 2026
Closing soon in Tennessee
- Water, Gas, Booster and Vacant Lots Grounds Maintenance · closes Dec 1, 2026
- HVAC Equipment Replacement at Strawberry Plains Campus, Pellissippi State Community College · closes Dec 2, 2026
- Mitchell Road Bridge Over Kendrick Creek Replacement · closes Dec 3, 2026
- Resurfacing on U.S. 321 (S.R. 35) from U.S. 25 (U.S. 70, S.R. 9) to near St. Tide Hollow Road - Cocke County · closes Dec 4, 2026
- Impact Fee Study and Update · closes Dec 4, 2026