Intermediate Bridge / Drainage / Grading - St. Lucie County, SR 712 from Glades Cut-Off Road to West of Jenkins Road
Florida Department of Transportation — FDOTFlorida#T4767
The Florida Department of Transportation is soliciting bids for the construction of improvements on SR 712 in St. Lucie County, Florida, from Glades Cut-Off Road to west of Jenkins Road. The scope includes bridge replacement, drainage and culvert systems, retaining walls, traffic control, pavement markings, signing, lighting, signalization, ITS, utilities, fencing, sodding, and other roadway and structural elements. The work spans 0.642 miles, with a contract duration of 1162 days. The estimated budget is $66,845,074.00.
On PublicBidSearch: the original bid posting and 1 bid document for this bid.
Overview
- Due
- Dec 2, 2026
- Submission
- mail, hand delivery
- Contract term
- 1162 contract days
- Documents analyzed
- 1
Scope of work
- Replace existing bridge structures over SR 712
- Construct new bridge superstructure and substructure using concrete Class IV
- Install 3,748 linear feet of Florida-I beams
- Construct 1,176 linear feet of drilled shafts (60" diameter)
- Install 13,172 square feet of sheet piling for temporary critical retaining walls
- Construct 64,725 square feet of permanent retaining wall system
Steps to Bid
What you'll need
Contract duration
1162 contract days from Notice to Proceed
Submission
Mail, Hand delivery
NAICS
237130, 237199, 237320, 237990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The improvements under this contract include, but are not limited to: bridge replacement (including removal of existing structures), concrete and steel work for superstructure and substructure, prestressed concrete beams, drilled shafts, driven piles, retaining walls (permanent and temporary), drainage systems (inlets, manholes, pipe culverts, endwalls, mitered sections), rip-rap for bank and shore protection, concrete and steel barriers, guardrail (standard and end anchorages), pavement markings (paint, thermoplastic, permanent tape), signing (single post, multi-post, tubular markers, overhead cantilever), lighting (standard, under-deck, spread footing, barrier-mounted, mast-arm mounted), signalization (mast-arm, pedestrian, controllers), ITS (WWVDS, fiber, conduits, splice/pull boxes), utilities (water/sewer piping, fittings, valves), fencing, sodding, and traffic control (temporary pavement, barriers, signage, work zone devices). The project includes 0.065 miles of bridge, 0.577 miles of roadway, and 1162 contract days. The proposal budget estimate is $66,845,074.00.
Key dates
- Questions due
- Nov 15, 2026, 5:00 PM Eastern Time
- Pre-bid meeting
- Dec 1, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 2, 2026
Documents
- T4767BSN.pdf11 pages
More from this agency
- Resurfacing of SR 93 (I-275 / I-75) from Hillsborough County Line to North of CR 54, Pasco County, Florida · closes Dec 2, 2026
- Traffic Signal Improvements at Intersections of State Road 5 (US-1/NW Federal Highway), NW Baker Road, NW North River… · closes Dec 2, 2026
- Traffic Signal Improvements on SR 212 (US 90/Beach Blvd) from Linden Avenue to Marion Road, Duval County, Florida · closes Dec 2, 2026
- Resurfacing and Infrastructure Improvements on State Road 5 (US 1) from N of 87th Street to S of Sebastian Boulevard,… · closes Dec 2, 2026
- Resurfacing of SR 985/NW 107 Avenue from North of Flagler Street to North of SR 836/Dolphin Expressway, Miami-Dade… · closes Dec 2, 2026
Similar bids in Florida
- Concrete Wall Installation at Marion County Judicial Center Parking · closes Jan 14, 2027
- Bid Notice — Toho Water Authority · closes Dec 17, 2026
- RFB No. 26/27-004: Orange Park Neighborhoods Milling and Resurfacing · closes Nov 30, 2026
- Pavement Resurfacing and Markings on SR 31, Charlotte County — E1Y50 · closes Dec 3, 2026
- Resurfacing of I-75 (SR 93) in Hamilton County from SR 6 to North of SR 143 (Hamilton Ave) – T2A89 · closes Dec 2, 2026
Closing soon in Florida
- Unit 54 Artistry Lakes Phase 1B Improvement Project — Public and Private Improvements · closes Dec 1, 2026
- FloridaSatNet Interoperable Push-to-Talk Satellite Network Services · closes Dec 3, 2026
- Design Services - Osceola Middle School HVAC and Plumbing Upgrades · closes Dec 3, 2026
- Fencing Supplies, Installation, and Repair Services · closes Dec 4, 2026
- Pest Control Services for Transit Vehicles · closes Dec 4, 2026