Resurfacing of SR 985/NW 107 Avenue from North of Flagler Street to North of SR 836/Dolphin Expressway, Miami-Dade County
Florida Department of Transportation — FDOTFlorida#T6629
Scope includes milling existing asphalt, placing Superpave asphalt concrete (PG76-22), installing friction course, and full traffic control with temporary barriers, signs, and signalization. Work includes concrete curbs and gutters, sidewalks, shoulder barriers, guardrail, manhole adjustments, and pavement markings using painted, thermoplastic, and preformed materials. The project is estimated at $1.33 million and has a 120-day contract duration.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026
- Time stated in bid documents
- Dec 2, 2026, 11:59 PM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 120 calendar days
- Documents analyzed
- 1
Scope of work
- Resurface 0.777 miles of SR 985/NW 107 Avenue
- Mill existing asphalt pavement (1.5” avg depth)
- Install friction course (FC-12.5, PG76-22)
Steps to Bid
- 1
Review the full bid solicitation notice and all attached documents, including the bid schedule, specifications, and drawings.
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project involves resurfacing 0.777 miles of SR 985/NW 107 Avenue in Miami-Dade County, Florida, from north of Flagler Street to north of SR 836 (Dolphin Expressway). Work includes traffic control with temporary barriers, channelizing devices, arrow boards, and portable changeable message signs. Installation of concrete curbs and gutters (Types E and F), concrete sidewalks (4” and 6” thick), shoulder concrete barriers (38” or 44” height), and guardrail (TL-3). Includes removal of existing concrete (128 SY), reworking limerock base (3” depth), and installing manholes. Pavement markings include painted (standard and skip), thermoplastic (white and yellow, various widths), and preformed thermoplastic. Signage includes single column ground signs (8 EA), retroreflective sign strips (7 EA), tubular markers (7 white, 18 yellow), and raised pavement markers (1,039 EA). Temporary signalization and traffic detection at intersections. Final surface markings and contingency amount included. Project budget estimate: $1,331,749.00.
Key dates
- Pre-bid meeting
- Dec 2, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 2, 2026
Documents
- T6629BSN.pdf3 pages
More from this agency
- Resurfacing of I-75 (SR 93) in Hamilton County from SR 6 to North of SR 143 (Hamilton Ave) – T2A89 · closes Dec 2, 2026
- Stormwater Pond Maintenance - Polk County, District 1 (E1Y94-R0) · closes Dec 3, 2026
- Mowing and Litter Removal for Roadside Maintenance — Glades and Hendry Counties, District 1 (E1Y91-R0) · closes Dec 3, 2026
- Tree Trimming and Removal - Polk County, District 1 · closes Dec 3, 2026
- Installation and Establishment of Landscaping and Irrigation at SR 25 (US 27) from McCoy Drive to Tomoka Blvd,… · closes Dec 3, 2026
Similar bids in Florida
- Resurfacing of SR 434 and SR 424 in Orange County, Florida – E53G3 · closes Dec 1, 2026
- Orange Belt Trail Phase 1 (Little Road to Cool Springs Parkway) · closes Jan 5, 2027
- Asphalt Repair - Brevard County (E54E7) · closes Dec 1, 2026
- Resurfacing and Safety Improvements on CR 118 (Airport Road) and Buckhorn Drive, Okaloosa County · closes Dec 2, 2026
- Construction of County Road 466A from East of Timbertop Lane to East of Poinsettia Avenue · closes Dec 3, 2026
Closing soon in Florida
- Public Accounting Services for the University of Central Florida's Direct Support Organizations · closes Dec 1, 2026
- Rexel USA Equipment, Software, and Services · closes Dec 2, 2026
- Lobbying Services and Networking of Grants with Appropriations · closes Dec 2, 2026
- Ellis Building Interior Renovation · closes Dec 2, 2026
- Construction, Engineering and Inspection Services for Key Deer Blvd (North of Watson Blvd) Roadway Rehabilitation… · closes Dec 3, 2026