OpenConstructionCloses Dec 2, 2026

Intermediate Bridge Replacement - Duval County, SR 115 (Lem Turner Road) - Bridge #720033

Florida Department of Transportation — FDOTFlorida#T2A91

The scope includes removal of the existing structure, construction of a new bridge with prestressed concrete beams, reinforced concrete substructure and approach slabs, installation of bridge deck grooving and planing, and construction of MSE walls, drainage systems, traffic signals, lighting, signing, guardrail, sidewalks, and temporary traffic control. The contract is for 1,095 contract days with a budget estimate of $40,307,607.00.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 2, 2026
Time stated in bid documents
Dec 2, 2026, 11:59 PM Eastern Time
Submission
mail, hand delivery
Contract term
1,095 contract days
Documents analyzed
1

Scope of work

  • Replace existing bridge structure on SR 115 (Lem Turner Road) at Trout River, Bridge #720033
  • Construct new bridge with Class IV concrete superstructure and substructure
  • Install prestressed concrete beams and reinforcing steel
  • Install traffic signals, lighting, and highway signing
  • Provide temporary traffic control measures including barriers and signs

Steps to Bid

  1. 1

    Review the full solicitation notice and all attached documents, including the bid schedule, specifications, and drawings.

  2. 2

    Submit any questions to the designated contact by the deadline of November 18, 2026. was Nov 18, 2026, 11:59 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Attend the pre-bid meeting on November 10, 2026, at 10:00 AM ET, held at the FDOT District 02 Office, 1000 N. Ponce de Leon Blvd, Jacksonville, FL 32202. was Nov 10, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Contract duration

1,095 contract days from the date of notice to proceed

Submission

Mail, Hand delivery

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project involves the replacement of the existing bridge structure on SR 115 (Lem Turner Road) at Trout River, Bridge #720033, in Duval County, Florida. Work includes installation of plain neoprene bearing pads, reinforcing steel, bridge deck grooving and planing, and precast concrete elements. Additional scope includes construction of MSE walls, barrier walls, milling and resurfacing of roadway, base work, shoulder treatment, drainage improvements, curb and gutter installation, traffic signals, lighting, highway signing, guardrail, sidewalks, and incidental construction. The project also includes temporary traffic control measures such as temporary barriers, channelizing devices, work zone signs, and temporary signalization. The contract is for 1,095 contract days with a special start date of N/A and a flexible start time of 120 days.

Key dates

Questions due
Nov 18, 2026, 11:59 PM Eastern Time
Pre-bid meeting
Nov 10, 2026, 10:00 AM Eastern Time
Bids due
Dec 2, 2026

Documents

  • T2A91BSN.pdf7 pages

See all documents · Download with Pro

More from this agency

Similar bids in Florida

Closing soon in Florida