OpenConstructionCloses Dec 2, 2026

Resurfacing of SR 934/NW 74 Street Connector, Miami-Dade County

Florida Department of Transportation — FDOTFlorida#T6623

The scope includes milling existing asphalt (108,289 sq yd), placing Superpave asphalt (85.4 tons) and friction course (8,985 tons), installing traffic control devices, concrete barriers, curbs, sidewalks, and pavement markings. Work also includes removal of existing concrete (1,547 sq yd), tree protection and removal, installation of traffic monitoring and signalization systems, and signage. The project is 2.212 miles long, with a 280-day contract duration and a budget of $4,888,078.00.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 2, 2026
Time stated in bid documents
Dec 2, 2026, 11:59 PM Eastern Time
Submission
mail, hand delivery
Contract term
280 days
Documents analyzed
1

Scope of work

  • Placement of 85.4 tons of Superpave asphaltic concrete
  • Installation of 1,120 Type III barricades and 17,850 channelizing devices
  • Installation of 233 linear feet of median concrete barrier and 86 linear feet of shoulder barrier
  • Installation of 748 linear feet of Type E concrete curb and 1,865 linear feet of Type F concrete curb

Steps to Bid

  1. 1

    Submit questions to the FDOT Central Office by December 1, 2026, at 11:59 PM ET. by Dec 1, 2026, 11:59 PM

  2. 2

    Attend the pre-bid meeting on November 29, 2026, at 10:00 AM ET, held at the FDOT Central Office, 1000 N.W. 1st Street, Miami, FL 33128. by Nov 29, 2026, 10:00 AM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project involves resurfacing SR 934/NW 74 Street Connector from west of NW 77th Court to east of Red Road in Miami-Dade County. Additional work includes conduit installation (145 linear feet directional bore, 390 linear feet directional bore, 3,484 linear feet directional bore, 30 linear feet bridge-mounted), pull and splice boxes (6, 7, 115, 5, 3), junction boxes (6), electrical service wires (1,880 linear feet), signal cables (3 linear feet new, 760 linear feet repair), signal controllers (1 unit Caltrans with standard lock, 1 removal), pedestrian signals (16 units LED countdown 1-way, 2 units 2-way), loop detectors (12 units Type 9, 8 units removal), video detection systems (2 cabinets, 13 above-ground units), and cellular modems (1 unit). The project is located in Miami-Dade County, Florida, with a total roadway length of 1.904 miles and a total proposal length of 2.212 miles.

Key dates

Pre-bid meeting
Nov 29, 2026, 10:00 AM Eastern Time
Bids due
Dec 2, 2026

Documents

  • T6623BSN.pdf5 pages

See all documents · Download with Pro