Community Facilities District (CFD) No. 18 Phase 2A Pump Station Improvements Project

California Public Notice — Sacramento CountyFolsom, California

This is a public works construction project for improvements to the pump station at the City of Folsom Water Treatment Plant. The work includes installation of pumping facilities, trenching, piping, paving, structural and geotechnical work, site grading, electrical and control systems, and all other site work as shown in the contract documents. The project must be completed within 480 calendar days after the Notice to Proceed. Bids must be submitted on unit price basis using supplied forms, sealed, and marked appropriately. Bidder questions must be submitted in writing by 4:00 PM on December 1, 2026. The project is subject to prevailing wages under California Labor Code Section 1771. A non-mandatory pre-bid conference is scheduled for November 30, 2026.

On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 10, 2026
Time stated in bid documents
Dec 10, 2026, 10:00 AM Pacific Time
Submission
mail, hand delivery
Required submission items
2 items · full checklist with Pro

Scope of work

  • Install pumping facilities
  • Trenching and backfilling
  • Paving and at-grade improvements

Steps to Bid

  1. 1

    Obtain contract documents was Nov 12, 2026, 4:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

    Download the proposal forms, project manual, and specifications from Public Purchase at [link available with Pro] starting November 12, 2026, at 4:00 PM.

  2. 2

    Attend pre-bid conference (optional) by Nov 30, 2026, 10:00 AM

    A non-mandatory pre-bid conference will be held at the WTP Plant, 194 Randall Drive, Folsom, CA 95630, on Monday, November 30, 2026, at 10:00 A.M. Bidders are to park on Willow Creek Drive near the trail corridor southeast of the WTP.

  3. 3

    Submit bidder questions by Dec 1, 2026, 4:00 PM

    All questions must be submitted in writing to Hydroscience Engineers via email to [email available with Pro] by 4:00 PM on Tuesday, December 1, 2026.

What you'll need

Insurance

Required

Contractor and its subcontractors shall fully comply with all the provisions of the California Labor Code governing the performance of public works contracts including, but not limited to, payment of prevailing wages, registration with the DIR pursuant to Labor Code Section 1725.5 to be qualified to bid on this project or listed as a subcontractor pursuant to Public Contract Code 4104, limitations on time worked, compliance with apprentice requirements, maintenance of payroll records, posting of wages at the job site and prohibitions against discrimination.

Contract duration

480 calendar days from the date of the written Notice to Proceed

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

at 110 Woodmere Rd Suite 120, Folsom, CA 95630 up to 10:00 A.M. on Thursday, December 10, 2026, and opened at 10:05 A.M. or as soon thereafter as business allows. The project involves improvements at the City of Folsom Water Treatment Plant located at 194 Randall Drive, Folsom, CA. Bids must be submitted on unit price basis, using printed forms supplied, enclosed in an envelope marked 'Sealed Proposals for: Community Facilities District (CFD) No. 18 Phase 2A Pump Station Improvements Project'. Bids must be submitted by registered plan holders and properly marked. Bidder questions must be submitted in writing to Hydroscience Engineers by 4:00 PM on Tuesday, December 1, 2026. The Engineer's Estimated Construction Cost is $8,820,000. A non-mandatory pre-bid conference will be held at the WTP Plant on Monday, November 30, 2026, at 10:00 A.M. No bidder may withdraw their bid for 120 calendar days after the bid opening. within 3 calendar days of the bid opening.

Key dates

Questions due
Dec 1, 2026, 4:00 PM Pacific Time
Pre-bid meeting
Nov 30, 2026, 10:00 AM Pacific Time
Bids due
Dec 10, 2026