OpenIFBCloses Dec 15, 2026

Southwestern Quadrant Trash Capture Device #1 Project

City of Yuba CityYuba City, California#1297-CON-26

The City of Yuba City is seeking bids for stormwater infrastructure improvements, including installation of a trash capture manhole and diversion vault, shoring, and roadway upgrades (curb, gutter, sidewalk). The contractor is responsible for all labor, materials, excavation, grading, shoring, stormwater bypass, backfilling, site prep, and restoration. The City will supply the trash capture manhole. Work must comply with approved plans and applicable codes. The estimated cost is $335,000. Bidders must submit questions by 5:00 PM on December 4, 2026, via [link available with Pro]. The project is funded by Prop 1 Grant and local funds. Prevailing wage requirements apply under California Labor Code Section 1773.8.

On PublicBidSearch: the original bid posting and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 15, 2026
Time stated in bid documents
Dec 15, 2026, 2:00 PM Pacific Time
Submission
electronic portal

Scope of work

  • Complete stormwater bypass and flow management
  • Restore roadway and surface after construction

Steps to Bid

  1. 1

    Register or pre-qualify if required

  2. 2

    Submit questions electronically via Official linkPro by 5:00 PM on December 4, 2026 by Dec 4, 2026, 5:00 PM

  3. 3

    Prepare and submit bid response by the due date and time by Dec 15, 2026, 2:00 PM

What you'll need

Insurance

Required

This Project is subject to the general prevailing rate of per diem wages as determined by the State of California Director of Industrial Relations, and travel and subsistence pay as such are defined in applicable collective bargaining agreements filed in accordance with Section 1773.8 of said Labor Code, for work needed and performed on this Project.

Submission

Electronic portal

How to submit

Bids must be submitted electronically via the Official linkPro portal. Questions must be submitted via the same portal by 5:00 PM on December 4, 2026.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The City will furnish the trash capture manhole; the Contractor is responsible for handling, installation, and integration into the stormwater system per contract documents. All work must comply with approved plans, specifications, applicable codes, standards, and permit requirements. The engineer's estimate for the work is $335,000. Inquiries must be submitted electronically via [link available with Pro] by 5:00 PM on December 4, 2026. The project is funded by the State of California's Prop 1 Integrated Regional Water Management Round 1 Grant and local city funds. The project is subject to prevailing wage rates as defined by the State of California Director of Industrial Relations under Section 1773.8 of the California Labor Code, with travel and subsistence pay governed by applicable collective bargaining agreements.

Key dates

Questions due
Dec 4, 2026, 5:00 PM Pacific Time
Bids due
Dec 15, 2026