Museum Gallery Renovation

Town of Estes Park — Internal ServicesEstes Park, Colorado

The project involves demolition, construction, electrical, HVAC, painting, flooring, concrete, and handrail installation. All work must be completed by April 9, 2027. A mandatory pre-bid conference is scheduled for Monday, November 30, 2026, at 1:00 PM MT. A bid bond of 5% of the total bid amount is required.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 11:00 AM Mountain Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
electronic portal, email
Contract term
Based on the anticipated lead time of materials, construction timeline/schedule provided by the contractor, plus an acceptable number of contingency days.
Documents analyzed
6 published · 4 analyzed

Scope of work

  • Construct ADA accessible vestibule entrance with interior and exterior doors.
  • Remodel gallery space for improved openness and functionality.
  • Perform demolition of existing walls, doors, windows, and flooring.
  • Install new drywall, insulation, doors, windows, flooring, and concrete elements.
  • Complete electrical, HVAC, and painting work as specified.
  • Ensure compliance with all local, state, and federal codes and accessibility standards.

Steps to Bid

  1. 1

    Submit questions or comments. by Dec 8, 2026, 5:00 PM

    Via BidNet or email to [email available with Pro]

What you'll need

Contract duration

60 calendar days from NTP

Submission

Electronic portal, Email

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 9 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project includes two main parts: 1) the creation of an ADA accessible vestibule entrance on the back (east) side of the gallery showroom, similar in style, size, and appearance to the main entrance, and 2) a remodel of the gallery space to create a more open and functional environment. It also includes providing and installing exterior and interior doors, an ADA automatic push button door operator, HVAC relocation and baseboard heating, electrical work for automatic doors and heaters, painting, flooring, concrete work for a new pad and sidewalk, and manufacturing and installing ADA-compliant handrails. For the gallery remodel, the scope includes removing floor platforms, walls, and slat walls, making sheetrock repairs, creating a door frame opening, removing and reinstalling a shop closet door, removing and discarding a theatre room door and an exterior window. Electrical work includes inspecting and repairing outlets, installing new outlets and conduit, relocating track lighting, terminating a light switch, converting a surface-mounted outlet, and reusing/installing new ceiling-mounted electrical outlets. Painting of interior walls and ceilings is included, but not the lobby and front vestibule. New carpeting will be installed in the lobby, gallery, and meeting room, along with new molding. The museum will be closed to the public from December 19th to June 2nd, and all work must be completed by April 9, 2027. The estimated design and construction duration is 60 calendar days. Bids are due by Thursday, December 17, 2026, at 11:00 AM MST.

Key dates

Questions due
Dec 8, 2026, 5:00 PM Mountain Time
Pre-bid meeting
Nov 30, 2026, 1:00 PM Mountain Time · Mandatory
Bids due
Dec 17, 2026
Expected award
Jan 25, 2027

Documents

  • Exhibit_A_Museum_Gallery_Vestibule_Site_Map.pdf6 pages
  • Exhibit_B_Museum_Gallery_Remodel_Site_Map.pdf2 pages
  • edit
  • edit
  • Exhibit_E_Estes_Park_Museum_Asbestos_Report_2016.pdf38 pages
  • ITB_COMPLETE_-_Museum_Gallery_Renovation.pdf106 pages