Resurfacing State Highway 79 from Milepost 1.6 to Milepost 4.1, Adams County, Colorado
Colorado DOT — Region 1Adams, Colorado#NHPP 079A-016 (27337)
Colorado DOT is soliciting bids for resurfacing State Highway 79 from milepost 1.6 to milepost 4.1 in Adams County. The work includes mill and overlay of existing pavement, new pavement markings, and ADA-compliant curb ramp improvements. The project is scheduled for advertisement on October 29, 2026, and will be let via Design-Bid-Build. The project is managed by Kathleen Dawson at (303) 398-6766.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 3, 2026, 11:59 PM Mountain Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 3
Scope of work
- Resurface SH79 from MP 1.6 to MP 4.1
- Improve curb ramps to meet ADA standards
Steps to Bid
- 1
Register with CDOT's eProcurement system (if not already registered)
- 2
Review the full bid package, including plans, specifications, and addenda, available via the CDOT website.
- 3
Attend the pre-bid meeting on October 29, 2026, at 10:00 AM at the CDOT Region 1 Office, 1000 18th Street, Denver, CO 80202. was Oct 29, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Mail, Hand delivery
NAICS
237131
How to submit
All submissions must be received by 11:59 PM on December 3, 2026. Submissions must be in a sealed envelope marked 'Bid for NHPP 079A-016 (27337) - Resurfacing SH79 MP 1.6 to MP 4.1'. The envelope must be delivered to the address above. Electronic submissions are not accepted.
In person/mail: Colorado Department of Transportation, Region 1, 1000 18th Street, Denver, CO 80202
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project is part of the Colorado Department of Transportation's 2026 construction forecast and is scheduled for advertisement on October 29, 2026. The project is being let through a Design-Bid-Build delivery method. The project is managed by Kathleen Dawson, Region 1 Project Manager, contactable at (303) 398-6766.
Key dates
- Pre-bid meeting
- Oct 29, 2026, 10:00 AM Mountain Time
- Bids due
- Dec 4, 2026
Documents
- CY_2026_Anticipated_Project_Advertisements.pdf6 pages
- GO_Sheet.pdf4 pages
- CDOTPlanHolders.pdf8 pages
More from this agency
- Mill/Overlay, ADA Updates, Bridge Work on WB US6 to WB I70 - Jefferson County, CO · closes Dec 4, 2026
- Culvert Rehabilitation Across Region 4 (MP 24.7-24.9) · closes Dec 11, 2026
- HMA Resurfacing, Guardrail, and Pavement Markings on SH 114 West of Saguache · closes Dec 11, 2026
- VRU Improvements at Intersection of US 50B and Hudson Avenue/Bonforte Boulevard, Pueblo County · closes Dec 11, 2026
- Bridge Resurfacing with FDR and HMA Overlay on SH 14 at Weld/Logan County Cl-East · closes Dec 11, 2026
Similar bids in Colorado
- 2026 South Branch Library ‘Refresh’ Project
- Building Decarbonization Enterprise Fund Education and Resource Development · closes Jan 5, 2027
- Expansion Construction Project — Invitation to Bid · closes Dec 10, 2026
- Logistics Support Services for Fort Carson, CO · closes Jan 4, 2027
- CTF DRDC Hail Storm 5/30/24 IFB1 TBD CMS212021 · closes Dec 21, 2026
Closing soon in Colorado
- Microwave Radio Software and Hardware Licensing · closes Nov 30, 2026
- CAVEA Lighting Upgrade and Installation at MSU Denver · closes Nov 30, 2026
- Camera Project - CCF · closes Dec 2, 2026
- Sun Net iTOA Software Maintenance Support Renewal – Annual Contract · closes Dec 2, 2026
- Old Clay Interceptor Replacement Project · closes Dec 3, 2026