Johnston Middle School – Cooling Tower Project
Johnston Community School DistrictJohnston, Polk, Iowa#001113
The work is to be completed in one phase by April 2026. Bids must be submitted on a lump sum basis. A 5% bid security is required. The successful bidder must provide 100% performance and payment bonds. The pre-bid conference is mandatory. Bidders must submit a completed Bidder's Status Form. Preference is given to Iowa-grown and produced materials.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 120 calendar days from notice to proceed
- Documents analyzed
- 1
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Install new pumps and piping
- Upgrade controls system
- Perform structural modifications
Steps to Bid
- 1
Obtain the bidding documents
Bidders may obtain copies from Beeline + Blue, 2507 Ingersoll Ave., Des Moines, IA, by depositing $150 (payable to Resource Consulting Engineers, LLC) or a valid MBI Plan Deposit card. Documents are also available online at [link available with Pro] and at several plan rooms including Greater Fort Dodge Growth Alliance, Dodge Data & Analytics, Des Moines Construction Update, Bid+Builders Exchange, Minnesota Builders Exchange, and Omaha Builders Exchange.
- 2
Attend bid opening
Bids will be opened shortly after 3:00 p.m. on November 17, 2026, in the District Administration Offices. The opening will be public.
What you'll need
Submission
Mail, Hand delivery
NAICS
238290, 238299
How to submit
Bids must be submitted in sealed envelopes. The envelope must be marked with the project number and bid number. The bid must include a completed Bidder's Status Form, bid security, and a lump sum offer.
In person/mail: 6510 NW 62nd Avenue, Johnston, IA 50131
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project is a single prime contract combining general, mechanical, and electrical work. Bid security of 5% of the total bid is required in the form of a certified check, credit union share draft, or surety bond on AIA A310. Preference is given to products and provisions grown and produced in Iowa. Nonresident bidders must comply with Iowa Code Section 8A.311B, subsection 4. A pre-bid conference is scheduled for November 3, 2026, at 3:30 p.m. at the school cafeteria.
Key dates
- Pre-bid meeting
- Nov 3, 2026, 3:30 PM Central Time
- Expected award
- Nov 23, 2026, 6:00 PM Central Time
Documents
- Notice-to-bidders-JMS-Cooling-Tower-Project.pdf4 pages
More from this agency
- Photography Services RFP 2026 — closes Nov 30, 2026
Similar open bids
- Conventional Nutrient Reduction Wetland Construction — Agriculture and Land Stewardship
- Nutrient Reduction Wetland Project — State of Iowa (University Procurement)
- Request for Qualifications - Junior High School Addition — Southeast Polk Community School District
- Shady Creek Ranger Facility - Construction Supplies — DEPT OF THE ARMY
- Two-Zone Tube Furnace Integrated with Glovebox and Purification System — ENERGY, DEPARTMENT OF
Closing this week nearby
- Kanawha Public Library: E-Rate FY2027 Internet Access and Data Transmission Service — closes Nov 20, 2026
- Everly Public Library: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 22, 2026
- ICN OSP Project #77244807, Polk County – Cable Relocation and Conduit Installation — closes Nov 23, 2026
- ICN OSP Project #77244807, Polk County – City of Des Moines Cable Relocation — closes Nov 23, 2026
- Light Duty Trucks, MY27 Chevrolet Silverado & GMC Sierra 1500 or Equivalent — closes Nov 23, 2026