Rehabilitation of Bridge Carrying US 3 and NH 11 over Mile Hill Road in Laconia, NH (121/028)
New Hampshire DOT — NHDOTLaconia, New Hampshire#41469
The New Hampshire Department of Transportation (NHDOT) is soliciting bids for the rehabilitation of the bridge carrying US 3 and NH 11 over Mile Hill Road in Laconia, NH (Bridge No. 121/028). The scope includes removal of the existing structure, excavation, structural fill, concrete work (Class AA and bridge deck), prestressed concrete deck panels, epoxy-coated reinforcing steel, shear connectors, structural steel, bridge rail systems (T3 and with snow screening), guardrails, fencing, traffic control barriers, temporary lighting, traffic signals, and pavement marking. Work also includes cold planing, asphalt overlay (HBP-3/8" surface mix, machine method), joint adhesive, tack coat, and temporary erosion control measures. Includes reconstruction of approach slabs, culverts, catch basins, and underdrains. Bidders must be prequalified and submit an RFP form. Proposals must be submitted electronically via [link available with Pro] by 2:00 PM, Eastern Time, on November 19, 2026. Questions must be submitted in writing to John Stockton at least five business days prior to the bid opening. The bid bond is 5% of the bid amount, and the performance bond is 100% of the bid amount. The work is located in Laconia, Belknap County, NH, with a completion date of November 19, 2027.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 19, 2026
- Time stated in bid documents
- Nov 19, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Submission
- electronic portal
- Contract term
- 36 months + Two additional one-year renewal terms
- Documents analyzed
- 5 published · 4 analyzed
Scope of work
- Remove existing bridge structure and excavate for new foundation
- Install temporary traffic control and safety barriers
Steps to Bid
What you'll need
Prequalification
RequiredSubmission
Electronic portal
NAICS
237130
Get alerts for bids like this
New bridge bids in New Hampshire
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Plans and specifications available for review at multiple locations. Hard copies available for $35 (non-refundable) plus $5 shipping. The project is funded under the Federal Aid Highway Act of 1956, requiring compliance with Davis-Bacon prevailing wage standards.
Documents
- laconia-41469.pdf2 pages
- 41469_0.pdf5 pages
- 41469-laconia.pdf2 pages
- 41469-laconia_4.pdf2 pages
- 41469-laconia_5.pdf2 pages
More from this agency
- NHVH Tarr ADA & IPC Compliance – Tilton, NH — closes Dec 2, 2026
- Installation of Wrong-Way Countermeasures at 25 Controlled Access Interchanges — closes Dec 3, 2026
- 64 South Street Rooftop Replacements, Concord, NH — closes Dec 16, 2026
Closing this week nearby
- Pedal Truck Gasoline Supply and Delivery — closes Nov 20, 2026
- Lake St & Bluff St Water Main Project — closes Nov 20, 2026
- RFP - Cleaning Services — closes Nov 20, 2026
- Independent Auditing Services — Request for Proposals — closes Nov 20, 2026
- Aggregates Supply and Delivery — closes Nov 20, 2026