OpenConstructionCloses Dec 2, 2026, 4:30 PM CT

Maintenance, Tribal, HMS, Leap - Cameron, Oklahoma (Work Order #174172)

Choctaw Nation Housing AuthorityCameron, Oklahoma#174172

Work includes flooring replacement with waterproof floating vinyl plank, drywall repair and installation, door and garage door replacement, fencing repair, roof leak repair, pest control, cabinet and sink repairs, painting, and full interior and exterior cleaning. Contractors must visit the site before bidding. All work must meet or exceed the 2019 International Residential Code. The contractor is responsible for all permits, line locates, waste removal, yard restoration, utility payments during work, and color selection by the property manager. Bids must be submitted via the Housing Bid Board only. The award is expected on December 16, 2026.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Due
Dec 2, 2026, 4:30 PM CT
Time stated in bid documents
Dec 2, 2026, 4:30 PM Central Time
Submission
online portal
Documents analyzed
1
Required submission items
4 items · full checklist with Pro

Scope of work

  • Repair drywall and install new ½” drywall throughout the home
  • Replace 3 entry doors and 1 interior door with pre-hung insulated doors
  • Replace missing vinyl chain-link fence and install new posts, anchors, and top ties
  • Repair roof leak and replace damaged gutters and downspouts
  • Clean and pressure wash exterior, garage floor, sidewalk, and driveway

Steps to Bid

  1. 1

    1

    Visit the project site at 16057 Ward Street, Cameron, OK 74932, before submitting a bid. Site visit is mandatory; change orders for unreported site conditions will not be approved.

  2. 2

    2

    Review all scope details, including flooring, drywall, doors, fencing, painting, pest control, cabinets, and cleaning requirements.

  3. 3

    4

    Complete the RFQ Submission Form with itemized pricing and a valid 'price good until' date.

  4. 4

    5

    Submit the bid exclusively through the Housing Bid Board at [link available with Pro] by 4:30 p.m. on December 2, 2026.

What you'll need

Contract duration

Not specified in the documents.

Submission

Online portal

NAICS

236220, 238290

How to submit

Bids must be submitted exclusively through the Housing Bid Board at Official linkPro. No email, mail, or other submission method will be accepted. Bids must be itemized and include a valid 'price good until' date.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
  • The 4-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Maintenance, Tribal, HMS, Leap. Location: Cameron, Oklahoma. Address: 16057 Ward Street, Cameron, Oklahoma, 74932. Scope: Special Instructions All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Home is a 3-bed 2 bath, brick home approx. 1500 sq. ft. shingle roof. Slab on grade. Property manager- Leslie James at 580-372-3721. Inspector- Phillip Hotella at 580-579-5100. All work done must meet or exceed 2019 IRC. It is highly recommended contractor view job before biding. Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed. Flooring: Remove existing floor covering throughout home, install new waterproof floating vinyl plank flooring with a minimum 3/16” thick flooring. Pull toilet and install flooring up to the floor flange. Install all new trim required for proper fit and finish. Leslie James will choose color. Remove and reinstall all baseboards. Drywall: Repair drywall throughout the house; install new ½” drywall, tape, bed, and texture to match the existing finish. Install 3 pre-hung six-panel insulated metal doors: 2 with peepholes and the one to the garage with spring hinges. Install all trim required for proper fit and finish. Install new combination, keyed-alike hardware, Kwikset or comparable. Caulk and seal inside and out. Paint to match new or existing finishes. Install new pre-hung interior door matching existing trim and hardware (Kwikset or comparable). Replace all interior door hardware to match existing. Remove and replace the overhead garage door; install a new insulated garage door matching the existing one, including all new track, locks, springs, and a garage door opener. Replace all damaged trim and door seals around the overhead garage door. Fencing: Replace the missing vinyl chain-link fence with a new 9-gauge fence matching the existing fence on the sides. Replace the wire around the bottom of the fence, including where the existing fence is. Install anchors approx. 1 ft. apart around the fence. Replace all missing/damaged posts to be concreted in the ground. Bring in clean topsoil to fill in the holes around the fence and house, and seed all disturbed ground with Rye grass seed. Special Instructions: Repair the roof leak. Remove the satellite dish and seal around the bracket. Remove and replace all smoke detectors throughout the house; install new smoke/carbon monoxide detectors. Remove and replace all damaged trim and window stools throughout the house; install new ones matching the existing. Install concrete splash blocks for all downspouts. Remove and replace both toilet seats. Replace the mirrors in the bathrooms; install new ones matching the existing ones. Remove and replace all air registers and the return air grill. Replace all missing window screens. Install new window blinds throughout the house. Install mulch in the flower beds. Remove everything that was left by the previous tenant (shelves on walls). Clean throughout the house, including all windows, ceiling fans, outlets, switches, etc., to be move-in ready when the work is complete. The contractor is responsible for paying all utilities at the home from the start of the work until the final is complete, including all deposits. Pest Control: Spray the home for bugs before starting the work and after the work is complete. Cabinets: Replace the missing kitchen cabinet drawers and include new slides. Remove and replace the plywood under the kitchen sink. Sand the kitchen cabinets and repaint; the property manager will choose the color. Painting: Caulk all cracks in siding, fascia, and around windows. Paint the interior walls, trim, ceiling, and exterior of the home. RFQ Submission Form There should be a form here. If you're seeing this message, something has gone wrong. Submission of Complete and Accurate Documentation: Bidders are responsible for submitting complete and accurate documentation. Bids must be itemized and include a valid price good until date. Any bid received without the required information will be voided.

Key dates

Bids due
Dec 2, 2026, 4:30 PM CT
Expected award
Dec 16, 2026

Documents

  • 2026-11-19__bid-174172--8-24-am.pdf3 pages

See all documents · Download with Pro