OpenIFBCloses Dec 2, 2026

MIA Central Terminal Public Restrooms Modernization Group 2

Miami-Dade CountyMiami, Florida#MCC 7360 RPQ No AA017B-2

This is a construction project to modernize public restrooms at Miami International Airport's Central Terminal. The contractor must perform general interior renovation and modernization of three restroom sets (male, female, janitor's closet), including new partitions, finishes, flooring, ceiling, hardware, and modifications to plumbing, HVAC, electrical, and fire protection systems. Work must be completed in at least two phases. The contractor must hold a valid General Contractor License and have at least five years of experience in the trade. Proof of experience for the past year must be submitted in a sealed envelope. The bid must be a lump sum amount on the MCC-7360 Attachment 5A Bid Form. The contractor is responsible for all permits, shop drawings, special inspections, as-built drawings, and close-out documentation. A mandatory pre-bid Microsoft Teams meeting and site visit are required. Failure to attend results in a non-responsive bid. RFIs must be submitted in writing at least five working days before the bid due date. The bid bond is required at submission. Performance and payment bonds are required within 10 working days of the Recommendation for Award. The contractor must provide $5,000,000 in liability insurance, with Miami-Dade County as an additional insured. The project is subject to liquidated damages of $917.40 per day for delays beyond the substantial completion date. The contractor must comply with the Sustainable Buildings Program, sea level rise considerations, and Green Building Practices. The contractor must provide three hard copies and three CAD copies of signed and sealed as-built drawings. The contractor must maintain a daily log and submit it upon request. The contractor must provide competent English-speaking supervisors. The contractor must comply with Public Records Laws and E-Verify requirements.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 2, 2026
Time stated in bid documents
Dec 2, 2026, 2:00 PM Eastern Time
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
731 calendar days from February 15, 2027
Documents analyzed
1
Required submission items
5 items · full checklist with Pro

Scope of work

  • Perform demolition and renovation in a minimum of two phases
  • Obtain all required permits and inspections prior to work commencement

Steps to Bid

  1. 1

    Review the full bid documents, including plans, technical specifications, and the MCC-7360 General Contract Conditions.

  2. 2

    Attend the mandatory pre-bid Microsoft Teams meeting and site visit on November 10, 2026, at 10:00 AM. was Nov 10, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit all questions and RFIs in writing to the MDAD Project Manager and the Clerk of the Board at least five working days before the bid due date. was Nov 26, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Insurance

Required

Commercial General Liability in an amount not less than $1,000,000 per occurrence, and $2,000,000 in the aggregate. Miami-Dade County must be shown as an additional insured with respect to this coverage.

License

General Contractor License

Submission

Mail, Hand delivery

NAICS

236220

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
  • The 5-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

All quantities are estimated. The contractor must comply with Davis-Bacon wage rates, MDAD environmental and safety policies, and all applicable federal, state, and local laws. The contractor must submit a Construction Progress Schedule and daily logs.

Key dates

Pre-bid meeting
Nov 10, 2026, 10:00 AM Eastern Time
Site visit
Nov 12, 2026, 10:00 AM Eastern Time
Bids due
Dec 2, 2026

Documents

  • MCC_7360_RPQ_No_AA017B-2.pdf10 pages

See all documents · Download with Pro

More from this agency

Similar bids near Miami

Closing soon near Miami