Microturbine Installation at Bergen Point Wastewater Treatment Plant (Capital Project 8180)
Suffolk County Department of Public Works — SANITATION ( SEWER DISTRICT )Hauppauge, Suffolk, New York
Suffolk County Department of Public Works is soliciting bids for the installation of two Capstone C200S microturbines at the Bergen Point Wastewater Treatment Plant. The project includes demolition of existing equipment, installation of new microturbines, gas and electrical connections, control systems, and firestopping. Work must comply with 2023 NEC and NYS interconnection rules. All outdoor components must be 316 stainless steel. Conduit must be PVC-coated rigid metal. Contractor must obtain all permits and submit as-built drawings in AutoCAD. The work site is at 600 Bergen Avenue, West Babylon, NY 11704.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Jan 7, 2027
- Time stated in bid documents
- Jan 7, 2027, 11:59 PM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 1
Scope of work
- Remove existing CHP system components
- Install gas piping and connections
- Control wiring and integration with BMS
- Firestopping per Hilti W-J-7109 and C-AJ-1155
Steps to Bid
- 1
Attend the pre-bid meeting on November 17, 2026, at 10:00 AM at the Bergen Point Wastewater Treatment Plant, 600 Bergen Avenue, West Babylon, NY 11704. was Nov 17, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit all questions to the project engineer by November 10, 2026, at 4:00 PM. was Nov 10, 2026, 4:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit a completed bid package by 11:59 PM on January 7, 2027. by Jan 7, 2027, 11:59 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The system will provide 200 kW of electrical generation and thermal energy for chiller and space heating water loops. Units will operate 24/7, modulating based on heat load. Contractor responsible for obtaining all permits, coordinating with utility (LIPA), and submitting as-built drawings in AutoCAD format. Existing equipment to be removed and discarded by contractor.
Key dates
- Pre-bid meeting
- Nov 17, 2026, 10:00 AM Eastern Time
- Bids due
- Jan 7, 2027
Documents
- Bergen_Point_WWTP_-_Microturbine_Installation_-_Plans_For_Bid_-_Stamped.pdf30 pages
More from this agency
- Renovations to Toilet Rooms in Police Headquarters – Phase III and IV, Yaphank, New York — closes Dec 1, 2026
- Painting of County Bridges: Goose Creek and Grand Avenue Bridges, Town of Southampton — closes Dec 10, 2026
- Restoration of Sagtikos Manor Carriage House – Phase II — closes Dec 15, 2026
- Bergen Point Wastewater Treatment Plant Microturbine Installation, West Babylon, NY — closes Jan 7, 2027
- TOWN OF WEST BABYLON CAPITAL PROJECT — closes Jan 7, 2027
Similar open bids
- Repair Potable Water System and Sanitary Sewer — Hedrick & Sturtevant Halls — Cornell University
- Town of Cairo Preliminary Inflow and Infiltration (PII) Study — Cairo, Town of
- Poultney Williams Street Sanitary Sewer Improvements — Village of Whitehall
- Residential Wastewater Service Laterals and Septic Infrastructure — PRIDE of Ticonderoga
- Southtowns Advanced Wastewater Treatment Facility (AWTF) Phase 2 Expansion — Thalle Construction Co Inc.
Closing this week nearby
- Barnacle Vehicle Immobilization Devices — closes Nov 19, 2026
- RFP - Cortland County Courthouse Spray Foam Installation — closes Nov 19, 2026
- Helicopter Maintenance — closes Nov 19, 2026
- KIPP NYC: E-Rate FY2027 Category 1 - Dedicated Internet Access and Managed MPLS WAN Services — closes Nov 19, 2026
- Alterations To: Donald R. Kline Technical School - REBID — closes Nov 19, 2026