TOWN OF WEST BABYLON CAPITAL PROJECT

Suffolk County Department of Public Works — SANITATION ( SEWER DISTRICT )Hauppauge, Suffolk, New York#CP 8180

8180, involving removal of four existing cogen units and installation of two new C200s microturbine units with associated mechanical, electrical, and structural work. The project requires coordination of all trades, removal of exhaust and cogen piping, and installation of new hot water piping, gas piping, ductwork, pumps, heat exchangers, and electrical wiring. Bidders must submit a sealed list of subcontractors for plumbing/gas fitting, HVAC (including fire sprinkler), and electrical work. A pre-bid walk-through is scheduled for December 3, 2026, at 10:00 AM at the Bergen Point Wastewater Treatment Plant. The project is subject to OSHA 10-hour safety training and apprenticeship requirements.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 7, 2027
Submission
hand delivery
Contract term
3 years + two additional one-year renewal terms
Documents analyzed
1

Steps to Bid

  1. 1

    Download and review all Contract Documents and any addenda

    Documents are available for review and download on the portal. Bidders must check the site frequently for updates.

  2. 2

    Submit a sealed list of subcontractors for plumbing/gas fitting, HVAC (including fire sprinkler), and electrical work

    The list must be submitted separately and sealed with the bid.

What you'll need

Submission

Hand delivery

NAICS

238290, 238299, 238999

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Scope includes: (A) Mechanical – removal of existing cogen piping and turbines; installation of new hot water piping, three new pumps, three heat exchangers, new gas piping, and new ductwork; (B) Electrical – wiring of new microturbine equipment into existing building electrical service, and installation of power wiring for new pumps; (C) Structural – submission of PE-stamped shop drawings for wall openings, fan support, and concrete pad extension for turbine installation. The project is to be bid as a single prime contract. Contract Documents are available for review and download at [link available with Pro]. Failure to comply results in bid disqualification.

Key dates

Pre-bid meeting
Dec 3, 2026, 10:00 AM Eastern Time
Site visit
Dec 3, 2026, 10:00 AM Eastern Time
Bids due
Jan 7, 2027

Documents

  • 3_-_NOTICE_TO_BIDDERS_2025-01-08_Final_.pdf2 pages