OpenRFPCloses Dec 9, 2026

Mill Ditch Structure Replacement – Lewistown, Montana

State of Montana ProcurementLewistown, Fergus, Montana#MDT-RFP/RFQ-2027-2333

A scoping meeting is scheduled for January 14, 2027. The contract will be awarded on a cost-plus fixed fee basis.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 9, 2026
Time stated in bid documents
Dec 9, 2026, 3:00 PM Mountain Time
Submission
electronic portal
Documents analyzed
2
Required submission items
3 items · full checklist with Pro

Scope of work

  • Replace Main Street bridge over Mill Ditch in Lewistown, Montana
  • Conduct structural evaluation and testing
  • Perform environmental and hydraulic analysis
  • Complete geotechnical and utility coordination
  • Prepare final plans, specifications, and estimates (PS&E)

Steps to Bid

  1. 1

    Review the RFP and attached Draft Scope of Services was Nov 10, 2026, 3:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Create an account on the State of Montana File Transfer Service (FTS) if not already registered by Dec 9, 2026, 3:00 PM

  3. 3

    Upload the proposal to FTS and send an email to [email available with Pro], [email available with Pro], and [email available with Pro] to confirm submission by Dec 9, 2026, 3:00 PM

  4. 4

    Ensure all required documentation (resumes, references, and cover page) is included in the appendices by Dec 9, 2026, 3:00 PM

What you'll need

Insurance

Required

Consultants will be subject to Federal and Montana nondiscrimination laws and regulations (see attached notice titled “MDT NONDISCRIMINATION AND DISABILITY ACCOMMODATION NOTICE”).

Contract duration

The project schedule will be developed and negotiated prior to executing the contract agreement. The anticipated timeline is as follows: December 9, 2026: Proposals due; December 23, 2026: Proposals reviewed, rated, and ranked; January 6, 2027: Consultant Selection Board meeting; January 14, 2027: 1

Submission

Electronic portal

NAICS

541330

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 9 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Montana Department of Transportation (MDT) is seeking proposals from consulting firms for the design of construction plans and specifications for the replacement of the Main Street bridge over Mill Ditch in Lewistown, Fergus County, Montana. The project includes structural evaluation and testing; bridge design; survey; environmental evaluation and permitting; hydraulic analysis and design; geotechnical analysis; signing and striping; and coordination with utilities and regulatory agencies. The selected consultant will be responsible for all services through the Plans, Specifications, and Estimates (PS&E) phase. Proposals must be submitted electronically via the State of Montana File Transfer Service (FTS) by 3:00 PM MST on December 9, 2026.

Key dates

Bids due
Dec 9, 2026
Expected award
Jan 6, 2027, 3:00 PM Mountain Time

Documents

  • 1471683-2129241627RFP-10764000-Mill-Ditch-Structures-Lewistown-Remediated.pdf26 pages
  • 1471683-event.pdf7 pages

See all documents · Download with Pro

More from this agency