OpenRFPCloses Nov 30, 2026

Repair and Overhaul of Moisture Separator (P/N A208-C3279, NSN 7RH 1680 016504184)

Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038327QTA13

The U.S. Navy is soliciting quotes for the repair and overhaul of a moisture separator (P/N A208-C3279, NSN 7RH 1680 016504184) to RFI condition. The work must be performed at the contractor’s facility using approved repair manuals and drawings. The contractor is responsible for all tools, test equipment, and materials. Repair Turnaround Time begins upon physical receipt at the contractor’s facility. Changes to repair procedures or facilities require PCO approval. BER items require DCMA concurrence and PCO authorization before repair. The contractor must provide process control documentation for Government review.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 30, 2026
Time stated in bid documents
Nov 30, 2026, 3:30 PM Eastern Time
Submission
electronic portal
Required submission items
3 items · full checklist with Pro

Scope of work

  • Restore to Ready for Issue (RFI) condition via disassembly, inspection, repair, reassembly, and testing
  • Provide all tools, test equipment, and special jigs or fixtures
  • Comply with MIL-STD-130 for markings and Rix Industries drawing 28953, Revision Latest

Steps to Bid

  1. 1

    Register on Official linkPro and ensure active status.

  2. 2

    Review the solicitation on Official linkPro at the provided URL.

  3. 3

    Ensure all required documentation (e.g., certifications, references) are included with the submission. by Nov 30, 2026, 3:30 PM

What you'll need

Submission

Electronic portal

NAICS

336413

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The contractor is responsible for all labor, materials, parts, test equipment, tooling, and special jigs or fixtures required for repair, as none are provided by the Government. Repair Turnaround Time (RTAT) is measured from the date of physical receipt at the contractor’s facility (as recorded in the CAV system) to the date of Government acceptance. The contractor must report all transactions by the end of the fifth business day after receipt. The Government will accept the proposal as a bilateral agreement to issue contractual documents via mail, fax, or electronic transmission. All changes to repair manuals, drawings, or repair facilities require prior written approval from the Procuring Contracting Officer (PCO). Unapproved changes are at the contractor’s risk. The contractor must obtain written concurrence from DCMA for all BER determinations and await PCO approval before proceeding. Missing on Induction (MOI) provisions apply.

Key dates

Bids due
Nov 30, 2026

More from this agency

Similar bids in Pennsylvania

Closing soon in Pennsylvania