The U.S. SAE-AS22759 wire must be used in place of MIL-W-81381 wire. No government-provided tooling or test equipment is available. The repair turnaround time is 118 days from asset receipt. The contractor must report monthly throughput capacity and must not accept assets after 365 days from contract award without agreement. Incremental and early deliveries are accepted. Records must be retained for 12 months after acceptance. All contract documents are considered issued upon electronic or postal transmission.
On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 3:30 PM Eastern Time
- Submission
Scope of work
- Repair pressurized transmitters per MIL-STD-130 and technical specifications
- Submit failure analysis and corrective action reports
- Conduct receiving inspection of all purchased materials
- Report monthly throughput capacity (X/month) and comply with 118-day RTAT
Steps to Bid
- 1
Register on Official linkPro and ensure active status.
- 2
Submit questions to the contracting officer by the deadline. by Dec 4, 2026, 3:30 PM
- 3
Prepare and submit the proposal by the due date. by Dec 4, 2026, 3:30 PM
What you'll need
Submission
NAICS
334513
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
No fixtures, jigs, dies, patterns, mylars, special tooling, or test equipment will be provided by the Government. Nonconforming material must be controlled through identification, segregation, and disposition. The contractor may use an Internal Review Board (IRB) for minor non-conformances, rework, or scrap, but not for 'AS-IS' disposition. Formal Material Review Board (MRB) authority for 'AS-IS' and minor non-conformances remains with the Government. The contractor must submit variance requests via DCMC to the NAVSUP Contracting Officer. The Government may conduct performance, environmental, and quality conformance testing on randomly selected repaired items. Historical records of data collection must be maintained for at least 12 months after acceptance. All contractual documents are deemed issued when deposited in the mail, transmitted by fax, or sent electronically. The contractor must comply with all requirements of the Statement of Work, and absence of inspection requirements does not relieve the contractor of responsibility to ensure compliance.
Key dates
- Questions due
- Dec 4, 2026, 3:30 PM Eastern Time
- Bids due
- Dec 4, 2026
More from this agency
- Repair of Thrust Shoe with Instrumentation (THRUST SHOE W/INSTR) · closes Dec 4, 2026
- CAP,PROTECTIVE,DUST · closes Dec 4, 2026
- CONE,INLET,AIRCRAFT · closes Dec 4, 2026
- Ball Valve Parts Kit for Shipboard System Use · closes Dec 4, 2026
- Gate Valves, Steel, 2.5 to 16 Inches, Class 600, for Shipboard Use · closes Dec 4, 2026
Similar bids in Pennsylvania
- Repair, Overhaul, and Testing of Transmitter Subassembly · closes Dec 3, 2026
- Invitation for Bid for Duty Weapons and Accessories · closes Nov 30, 2026
- 48--VALVE REGULATING SY, IN REPAIR/MODIFICATION OF · closes Dec 10, 2026
- Repair and Modification of Inertial Navigation Systems · closes Dec 3, 2026
- 34--BRAZE WIRE 1/16" · closes Dec 7, 2026
Closing soon in Pennsylvania
- Valve, Charging Assembly for 5-inch/54-Caliber Gun Mount MK45 · closes Dec 1, 2026
- Replacement of Rooftop HVAC Unit at Blair County Airport Terminal · closes Dec 2, 2026
- Office Supplies - 2026 · closes Dec 3, 2026
- Remote Launch E Pnl Module Assembly and Rim · closes Dec 3, 2026
- Distributing System - Request for Quotation · closes Dec 4, 2026