OpenServicesCloses Nov 20, 2026

Moorpark College Student Service Annex Sewer Line Reroute

Ventura County Community College DistrictCamarillo, California#742

This project involves the rerouting of a sewer line at Moorpark College. Prevailing wages are required. A mandatory job walk will be held on November 10, 2026, at 10:00 a.m. The deadline for questions is November 13, 2026, at 5:00 p.m. Bids are due by November 20, 2026, at 3:00 p.m. and must be submitted in sealed envelopes to the Ventura County Community College District Purchasing Department. No electronic proposals will be accepted. The contract duration is 45 calendar days. The award will be made to the lowest responsive responsible bidder.

Open Original Bid Source Pro

Overview

Due
Nov 20, 2026
Time stated in bid documents
Nov 20, 2026, 3:00 PM Pacific Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
45 (45) consecutive calendar days after the date stated in the District’s Notice to Proceed
Documents analyzed
2

Scope of work

  • Furnish and install all piping as shown on plumbing drawings and described in notes.
  • Provide all necessary labor, devices, hardware, and systems for safe and operable systems.
  • Include drilling, concrete, saw cutting, trenching, backfill, mounting, piping, valves, and patching.
  • Prevailing wage rates are required.

Steps to Bid

  1. 1

    Attend the mandatory Job-Walk. by Nov 10, 2026, 10:00 AM

    Meet at the Moorpark College, Maintenance & Operations Dept., 7075 Campus Rd., Moorpark, CA 93021.

  2. 2

    Submit questions. by Nov 13, 2026, 5:00 PM

    Email questions to David Cienfuegos, Purchasing Specialist at [email available with Pro].

  3. 3

    Submit Bid Proposal. by Nov 20, 2026, 3:00 PM

    Deliver sealed bid proposals to Ventura County Community College District Purchasing Department, 761 E Daily Drive, Suite 200, Camarillo, CA, 93010.

What you'll need

Contract duration

45 consecutive calendar days after the date stated in the District’s Notice to Proceed

Award method

The award of the Contract, if any, will be to the responsible Bidder submitting the lowest responsive Bid Proposal on the basis of the Base Bid Proposal and accepted bid alternate items, if any.

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

In connection with this work, contractor shall also furnish and install all necessary labor, devices, hardware and system required to make said systems properly and safely operable, including, but not limited to drilling, concrete, saw cutting, trenching and backfill, mounting and piping, concrete, valves, & patching. The contract duration is 45 consecutive calendar days after the Notice to Proceed.

Key dates

Questions due
Nov 13, 2026, 5:00 PM Pacific Time
Pre-bid meeting
Nov 10, 2026, 10:00 AM Pacific Time · Mandatory
Site visit
Nov 10, 2026, 10:00 AM Pacific Time
Bids due
Nov 20, 2026

Documents

  • bid_742_bid_packet.pdf123 pages
  • bid_742_addendum_1.pdf3 pages

See all documents · Download with Pro

Contact

Agency contact for this bidName, email & phone — included with ProPro

More from this agency

Similar open bids

Closing this week nearby