MRR-27-1101 Education Center Chiller Replacement
Valdosta State UniversityGeorgia#PE-55100-RFQ-2027-000000070
Valdosta State University is soliciting bids for the MRR-27-1101 Education Center Chiller Replacement project. The work involves the installation of new air-cooled chillers and pumps. A mandatory pre-bid conference will be held on November 17, 2026, at 10:00 AM. Bidders must meet state licensure and minimum experience requirements. A bid bond of not less than five percent of the bid is required. Performance and payment bonds, each equal to 100 percent of the contract sum, will be required prior to contract execution. The contract will be awarded on a lump sum basis to the lowest responsive and responsible bidder.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 8, 2026
- Time stated in bid documents
- Dec 8, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- sealed bid, hand delivery
- Documents analyzed
- 4 published · 2 analyzed
Scope of work
- Serve the Education Building.
- Serve the Jennett Addition.
Steps to Bid
- 1
Obtain Bidding Documents from NBP Engineers, Inc. or request electronically.
Bidding Documents may be obtained at the office of the Design Professional, NBP Engineers, Inc., Phone: (478) 745-1691. Request electronic documents via email to [email available with Pro] or [email available with Pro].
- 2
Attend the mandatory pre-bid conference. was Nov 17, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
There will be a pre-bid conference held on Tuesday, November 17, 2026, at 10:00 AM at VSU Physical Plant Office, Conference Room, 2903 North Ashley Street, Valdosta, GA 31602. Attendance at this conference is MANDATORY for any Contractor intending to bid on this project.
- 3
Submit sealed bids. by Dec 8, 2026, 2:00 PM
Bids must be physically on the table in the Bid Room by 2:00 PM o’clock, at the time legally prevailing in Atlanta, Georgia on Tuesday, December 8, 2026.
What you'll need
Bid security
RequiredBoth a performance bond and a payment bond will be required, each in an amount equal to 100 percent of the Contract Sum prior to execution of contract.
Contract duration
365 consecutive calendar days beginning the day after the date of the Proceed Order
Award method
The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget.
Submission
Sealed bid, Hand delivery
NAICS
90927, 90966, 91450, 91036
How to submit
Bids must be enclosed in an opaque, sealed envelope; marked with the Bid Date, Bid Time, Bid Number, Name of Project; and identified with the words "Bid for Construction.” Bids must be placed in the hands of the Owner at the specified location by not later than the hour and date named in the Invitation to Bid. It is the sole responsibility of the bidder to ensure the delivery of the bids to the required address.
In person/mail: VSU Physical Plant Office, Conference Room, 2903 North Ashley Street, Valdosta, GA 31602
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bids must be physically on the table in the Bid Room by 2:00 PM o’clock, at the time legally prevailing in Atlanta, Georgia on Tuesday, December 8, 2026. Bidding Documents may be obtained at the office of the Design Professional, NBP Engineers, Inc., Phone: (478) 745-1691. Request electronic documents via email to [email available with Pro] or [email available with Pro]. There will be a pre-bid conference held on Tuesday, November 17, 2026, at 10:00 AM at VSU Physical Plant Office, Conference Room, 2903 North Ashley Street, Valdosta, GA 31602. Attendance at this conference is MANDATORY for any Contractor intending to bid on this project. Interested firms are required to meet state licensure requirements and document minimum experience requirements with construction as indicated in the documents.
Key dates
- Pre-bid meeting
- Nov 17, 2026, 10:00 AM Eastern Time · Mandatory
- Bids due
- Dec 8, 2026
Documents
- 202611_supportingdocs_PE-55100-RFQ-2027-000000070-2026-11-03_16_13_09-496a85.pdf9 pages
- 202611_supportingdocs_PE-55100-RFQ-2027-000000070-2026-11-03_16_13_21-a26205.pdf
- 202611_supportingdocs_PE-55100-RFQ-2027-000000070-2026-11-03_16_13_37-b4560e.pdf299 pages
- 202611_supportingdocs_PE-55100-RFQ-2027-000000070-2026-11-17_11_07_79-18f111.pdf2 pages
More from this agency
- Print Shop Paper Supply for Valdosta State University — closes Dec 11, 2026
- Pine Straw Supply and Installation for Valdosta State University — closes Dec 15, 2026
Similar open bids
- Lambdin Hall Chiller Replacement at Gordon State College — Gordon State College
- Camden Campus HVAC Pump Replacements — College Of Coastal Georgia
- RFP2027-01 - HVAC City of Duluth — Duluth, City Of
- Self-Contained Breathing Apparatus (SCBA) Systems for Brooks County Fire Rescue — Brooks County Board Of Commissioners
- Sequoyah Middle School HVAC Replacement, Project No. 2027-02 — Clayton County Board Of Education
Closing this week nearby
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Resurface & Maintenance of SR 216 from SR 45 to SR 37 — closes Nov 20, 2026
- ADDENDUM NO. 1 – EXTENSION OF PROPOSAL DEADLINE — RFP 2026-03: Playground Equipment, Safety Surfacing, Delivery and… — closes Nov 20, 2026
- Playground Equipment, Safety Surfacing, Delivery and Installation — RFP No. 2026-03 — closes Nov 20, 2026