MSU IFB Brand Specific Aerowerks Rotary Tray Accumulator/Conveyor System Purchase and Installation
State of Montana ProcurementBozeman, Gallatin, Montana#MSU-IFB-2027-0880
The system must be fully operational by August 2, 2027, with delivery by April 30, 2027 and installation in May 2027. The Contractor must provide all equipment, labor, materials, supervision, integration with existing dish machines and infrastructure, testing, startup, and on-site training. The contract is non-exclusive and may be used by other Montana University System units under equal or more favorable terms. Bidders must be registered in SmartBuyMSU and provide a W-9 form. The solicitation is an open invitation for bid.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 23, 2026
- Bid bond
- 5%
- Submission
- electronic portal
- Contract term
- through August 31, 2027
- Documents analyzed
- 5
- Required submission items
- 15 items · full checklist with Pro
Scope of work
- Purchase and installation of an Aerowerks Rotary Tray Accumulator/Conveyor System with 80-tray capacity
- Installation and commissioning in May 2027
Steps to Bid
- 1
Review and accept the instructions for submitting a bid.
- 2
Review and accept the IFB general requirements.
- 3
Review and accept the IFB delivery language.
- 4
Review and accept the attached draft contract.
- 5
Submit a current W-9 form.
- 6
Provide company name used on invoices.
- 7
Provide complete remit to address for payments if different from W-9.
What you'll need
Contract duration
The system must be fully operational by August 2, 2027.
Submission
Electronic portal
NAICS
238290
Get alerts for bids like this
New plumbing bids in Montana
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The system must have an 80-tray accumulation capacity, be constructed of stainless steel, include a double slat-belt tray return conveyor, integrated control panel, remote start/stop station, anti-jam sensors, accumulation photo sensor, pre-rinse stations, soiled dish tables, hose clean-up station, and integration with existing dish machines and building infrastructure. The system must be delivered by April 30, 2027, with installation occurring in May 2027 following Spring Commencement. The Contractor shall also provide on-site training for University personnel, all applicable warranties, operating manuals, and manufacturer support.
Documents
- 1460262-1670906077PD-78_MSU_Standard_Terms_Conditions_11.20.2023msuLC.pdf3 pages
- 1460262-2123494579DRAFT_contract_.pdf12 pages
- 1460262-2123387424Attachment_B_Scope_of_Work.docx
- 1460262-2123387856Attachment_A_Required_Specifications.docx
- 1460262-event.pdf7 pages
More from this agency
- Roberts Rest Area Maintenance · closes Nov 30, 2026
- Region 2 ATV with Tracks · closes Dec 1, 2026
- Computer-Assisted Mass Appraisal (CAMA) System Replacement · closes Dec 1, 2026
- Public Water System Technical, Financial & Managerial Assistance · closes Dec 1, 2026
- DMA DES Multi-Hazard Plan · closes Dec 2, 2026
Closing soon near Bozeman
- Johnstone Complex Re-Roof · Bozeman · closes Dec 1, 2026
- Hamilton Hall Life Safety System Improvements · Bozeman · closes Dec 2, 2026
- Atkinson Quads Reroof and Window Replacements · Bozeman · closes Dec 3, 2026
- Resurfacing - Seal & Cover, South Cottonwood Road, Bozeman, Montana · Bozeman · closes Dec 4, 2026
- 2026 Groundwater Source Expansion Project: Drilling and Construction of Test and Public Water Supply Wells · Belgrade · closes Dec 4, 2026