Nddot Ss-arp-9-999(488)
North Dakota Department of Transportation — NDDOTMcKenzie, North Dakota#SS-ARP-9-999(488)
NOTICE TO CONTRACTORS The North Dakota Department of Transportation (NDDOT) will receive bids for the construction of the following project(s): Job No.: 23486 Project No(s).: IM-5-094(157)018, IM-5-094(158)027, & SS-5-016(031)111 Length: 6.098 Type: CULVERT REHABILITATION, GRADING, EMBANKMENT & EROSION CONTROL County(s): MCKENZIE, BILLINGS, & GOLDEN VALLEY Cos Location: I-94, BUFFALO GAP ROAD E 3.5 MILES; I-94, W OF E MEDORA INTERCHANGE TO 2 MILES EAST; & ND 16, 3 MI N OF GOLDEN VALLEY / MCKENZI
On PublicBidSearch: the original bid posting, 14 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 11, 2026, 11:59 PM CT
Project details
NOTICE TO CONTRACTORS The North Dakota Department of Transportation (NDDOT) will receive bids for the construction of the following project(s): Job No.: 23486 Project No(s).: IM-5-094(157)018, IM-5-094(158)027, & SS-5-016(031)111 Length: 6.098 Type: CULVERT REHABILITATION, GRADING, EMBANKMENT & EROSION CONTROL County(s): MCKENZIE, BILLINGS, & GOLDEN VALLEY Cos Location: I-94, BUFFALO GAP ROAD E 3.5 MILES; I-94, W OF E MEDORA INTERCHANGE TO 2 MILES EAST; & ND 16, 3 MI N OF GOLDEN VALLEY / MCKENZIE COUNTY LINE N 4.5 MILES Job No.: 23495 Project No(s).: SS-ARP-9-999(488) Length: 3.643 Type: GRADING, STREAM MITIGATION, AND INCIDENTALS County(s): MCKENZIE Co Location: SAND CREEK, NEAR CMC 2702 3 MI W OF ND 1806 (STREAM MITIGATION BANK - MCKENZIE COUNTY) Job No.: 24881 Project No(s).: NH-XB-7-085(140)164 Length: 18.852 Type: MILL AND OVERLAY County(s): MCKENZIE & WILLIAMS Cos Location: US 85, NEAR JCT ND 200 N TO JCT US 2 (WILLISTON) - NB / SB Bids will be received via the Bid Express on-line bidding exchange at [link available with Pro] until 09:30AM, November20, 2026. Bids will be opened at that time at the NDDOT building on the capitol grounds in Bismarck and the bid results will be distributed and posted online at [link available with Pro] approximately 30 minutes after bids are opened. The proposal forms, plans, and specifications are available on the NDDOT website at [link available with Pro] and may be inspected at the Construction Services Division, 608 East Boulevard Aven Published in a North Dakota newspaper on 2026-10-28.
Key dates
- Bids due
- Dec 11, 2026, 11:59 PM CT
Documents
- Job_23495_Request_for_Proposal.pdf
- SS-ARP-9-999_488__ED_Final_Plans_1of3.pdf
- SS-ARP-9-999_488__ED_Final_Plans_2of3_CrossSections.pdf
- SS-ARP-9-999_488__ED_Final_Plans_3of3_StandardDrawings.pdf
- Supplemental_Design_Data_23495-zz.pdf1 pages
- notbidob20261120.pdf18 pages
- 394344-2026-10-28_1001.txt
- Addendum_1_Job_23495.pdf2 pages
6 more files
More from this agency
- NDDOT IM-XB-2-094(186)217 — Kidder County — Replace Bridge · closes Dec 11, 2026
- Guardrail Installation and Foreslope Flattening on I-29, Cass County, North Dakota · closes Dec 11, 2026
- BRJ-0053(080) — Williams County — Multiple Bridge Structural Miscellaneous Removal · closes Jan 1, 2027
- NDDOT BRC-1927(065) — Grant County — Structure Replacement at 9N CARSON · closes Jan 1, 2027
- Replace Bridge at ND/US 3, Bridges NE of Finley, Steele County, North Dakota · closes Jan 1, 2027
Similar bids near McKenzie County
- RFQ – Tenant Business Plan Submittal Request · Watford City
- FBRW Tank Mixers and Blowers Installation, Contract 2026-1 · New Town · closes Dec 16, 2026