OpenIFBCloses Dec 16, 2026, 10:30 AM CT

Oklahoma Avenue MIS Capacity Improvements

Milwaukee Metropolitan Sewerage District — Engineering ServicesMilwaukee, Wisconsin#C03013C01

The Milwaukee Metropolitan Sewerage District is soliciting sealed bids for the construction of the Oklahoma Avenue MIS Capacity Improvements, Contract No. C03013C01, in Milwaukee and West Allis, Wisconsin. The work includes installing 3,300 feet of 48-inch sewer in tunnel, 220 feet of 8-inch sewer in open cut or jacked pipe, and various other sewer and manhole replacements and abandonments. The contractor will also decommission a pump station and install 175 feet of 6- or 8-inch water main. Work will occur along South 72nd Street and West Oklahoma Avenue. Bids must be submitted electronically via Quest CDN by 10:30 a.m. local time on December 16, 2026. Bidders must register as Plan Holders to access documents. A pre-bid presentation will be posted by November 23, 2026. Site tours are available at the bidder’s convenience. Questions must be submitted in writing to Millie Neidhardt by December 11, 2026. Bids must remain valid for 120 days. The contract completion time is 850 days from Notice to Proceed. Davis-Bacon prevailing wage rates apply.

On PublicBidSearch: the newspaper notice, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 16, 2026, 10:30 AM CT
Time stated in bid documents
Dec 16, 2026, 10:30 AM Central Time
Bid bond
5%
Submission
electronic portal
Contract term
850 days from the date of Notice to Proceed
Documents analyzed
3

Scope of work

  • Install 150 linear feet of 12-inch diameter sewer in open cut or jacked pipe
  • Replace 6 MMSD concrete manholes
  • Replace 4 City of Milwaukee precast concrete manholes
  • Replace 1 City of West Allis precast concrete manhole

Steps to Bid

  1. 1

    Register as a Plan Holder on Quest CDN (Official linkPro) to access the contract documents and receive updates.

  2. 2

    Attend the pre-bid presentation (available online via Quest CDN and the District’s Procurement Opportunities page) by November 23, 2026. was Nov 23, 2026

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit all questions in writing to Millie Neidhardt, [email available with Pro], no later than 5 days before the bid opening date (by December 11, 2026). by Dec 11, 2026

  4. 4

    Prepare and submit the bid electronically via Quest CDN at Official linkPro by 10:30 a.m. local time on December 16, 2026. by Dec 16, 2026, 10:30 AM

What you'll need

Contract duration

850 calendar days from the date of Notice to Proceed

Submission

Electronic portal

NAICS

237130

How to submit

Bids must be submitted electronically via Quest Construction Data Network (Quest CDN) at Official linkPro. Bidders must be registered as Plan Holders to access the bidding portal. The bid form and required attachments must be completed and submitted through the online system.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The contractor shall perform all associated pavement and surface restoration, utility relocation, erosion control, traffic control, and geotechnical monitoring in accordance with the Contract Documents. The District uses online project bidding through the Quest Construction Data Network (CDN). A pre-bid presentation will be posted on Quest CDN and the District’s Procurement Opportunities web page no later than November 23, 2026. All questions must be submitted in writing to Millie Neidhardt, [email available with Pro], no later than 5 days before the bid opening date. Bids must remain effective for at least 120 days from the bid due date. The District reserves the right to reject all bids or any bids not conforming to the intent and purpose of the contract documents. Bidders must also comply with Local Workforce Participation and Apprenticeship Utilization requirements.

Key dates

Questions due
Dec 11, 2026, 10:30 AM Central Time
Bids due
Dec 16, 2026, 10:30 AM CT

Documents

  • C03013C01_ITB_20261116_20261118092436_3260.pdf3 pages
  • tdr-2026-11-25-0-001_13.pdf1 pages
  • tdr-2026-11-18-0-001_09.pdf1 pages

See all documents · Download with Pro