On-Call Plan Check and Engineering Services for the Santa Paula Branch Line Right-of-Way
Ventura County Transportation CommissionVentura, California
Tasks include reviewing rail modifications, utility crossings, track work, drainage, and compatibility with a planned Class I bike trail. The contract is time-and-materials with a not-to-exceed amount, a 12-month initial term, and up to three 12-month extensions. Proposals must be submitted as a single PDF (≤10 pages, excluding attachments) and a separate fee schedule PDF. The solicitation is open to all qualifying firms. The contract administrator is Amanda Fagan.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 12, 2026
- Submission
- Contract term
- 12 months + up to three (3) 12-month extensions
- Documents analyzed
- 1
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Review utility, pipeline, and wiring crossings within the right-of-way
- Review at-grade and grade-separated crossings
- Review excavation and shoring near track
- Review temporary access and overhead or crane work
- Review fencing and trespass measures
Steps to Bid
- 1
Register with VCTC and obtain access to the RFP portal if required.
- 2
Review the RFP and all attachments, including the Q&A document dated November 25, 2026.
- 3
Submit questions to Amanda Fagan, Director of Planning and Sustainability, at [email available with Pro], by November 25, 2026. was Nov 25, 2026, 4:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Prepare and submit a proposal as a single PDF (≤10 pages, excluding attachments) and a separate fee schedule PDF.
What you'll need
Submission
NAICS
541330, 541370
How to submit
Submit proposals as a single PDF (≤10 pages, excluding attachments) and a separate fee schedule PDF. All submissions must be sent to [email available with Pro].
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Reviews must ensure compliance with AREMA guidelines, SCRRA Engineering Standards, and California Public Utility Code (CPUC) standards, with the more stringent standard governing where they differ. The consultant must coordinate with Sierra Northern Railway as needed. Questions must be directed to Amanda Fagan, Director of Planning and Sustainability, at [email available with Pro].
Key dates
- Questions due
- Nov 25, 2026, 4:00 PM Pacific Time
- Bids due
- Dec 12, 2026
Documents
- SPBL-On-Call-Rail-Engineering-Response-to-Questions-Updated-RFP-Template-Con.pdf19 pages
More from this agency
- VCTC Intercity Transit Regional Fixed Route Service Operation and Maintenance · closes Dec 5, 2026
- Sespe Creek Overflow Railroad Bridge Repair Project: Habitat Restoration Plan (HRP) Maintenance and Monitoring · closes Dec 17, 2026
- On-Call Weed Abatement, Debris Removal and Related Property Maintenance · closes Jan 9, 2027
Similar bids in California
- Unit Inspection Services · closes Dec 3, 2026
- Request for Qualifications: Prequalified Architectural Companies · closes Dec 3, 2026
- Criteria Architect Services for the New Tracy Courthouse · closes Dec 7, 2026
- As-Needed Non-Design Engineering Services · closes Dec 18, 2026
- Professional Engineering Services for CSA 70 BL Septic-to-Sewer Expansion Project · closes Dec 1, 2026
Closing soon in California
- Fire Alarm System Replacement for California Military Department · closes Dec 1, 2026
- As-Needed Vector Surveillance Products · closes Dec 1, 2026
- 2027 CIPP Lining Project (CIP 27701) · closes Dec 2, 2026
- 2027 CIPP Lining Project, CIP 27701 · closes Dec 2, 2026
- Repair, Replacement, and Construction of Selected Concrete Sidewalks, Curbs, and Gutters (FY24-25) · closes Dec 3, 2026