OpenServicesCloses Dec 12, 2026

On-Call Plan Check and Engineering Services for the Santa Paula Branch Line Right-of-Way

Ventura County Transportation CommissionVentura, California

Tasks include reviewing rail modifications, utility crossings, track work, drainage, and compatibility with a planned Class I bike trail. The contract is time-and-materials with a not-to-exceed amount, a 12-month initial term, and up to three 12-month extensions. Proposals must be submitted as a single PDF (≤10 pages, excluding attachments) and a separate fee schedule PDF. The solicitation is open to all qualifying firms. The contract administrator is Amanda Fagan.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 12, 2026
Submission
email
Contract term
12 months + up to three (3) 12-month extensions
Documents analyzed
1
Required submission items
1 items · full checklist with Pro

Scope of work

  • Review utility, pipeline, and wiring crossings within the right-of-way
  • Review at-grade and grade-separated crossings
  • Review excavation and shoring near track
  • Review temporary access and overhead or crane work
  • Review fencing and trespass measures

Steps to Bid

  1. 1

    Register with VCTC and obtain access to the RFP portal if required.

  2. 2

    Review the RFP and all attachments, including the Q&A document dated November 25, 2026.

  3. 3

    Submit questions to Amanda Fagan, Director of Planning and Sustainability, at [email available with Pro], by November 25, 2026. was Nov 25, 2026, 4:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Prepare and submit a proposal as a single PDF (≤10 pages, excluding attachments) and a separate fee schedule PDF.

What you'll need

Submission

Email

NAICS

541330, 541370

How to submit

Submit proposals as a single PDF (≤10 pages, excluding attachments) and a separate fee schedule PDF. All submissions must be sent to [email available with Pro].

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Reviews must ensure compliance with AREMA guidelines, SCRRA Engineering Standards, and California Public Utility Code (CPUC) standards, with the more stringent standard governing where they differ. The consultant must coordinate with Sierra Northern Railway as needed. Questions must be directed to Amanda Fagan, Director of Planning and Sustainability, at [email available with Pro].

Key dates

Questions due
Nov 25, 2026, 4:00 PM Pacific Time
Bids due
Dec 12, 2026

Documents

  • SPBL-On-Call-Rail-Engineering-Response-to-Questions-Updated-RFP-Template-Con.pdf19 pages

See all documents · Download with Pro

More from this agency

Similar bids in California

Closing soon in California