OpenConstructionCloses Dec 17, 2026

Sespe Creek Overflow Railroad Bridge Repair Project: Habitat Restoration Plan (HRP) Maintenance and Monitoring

Ventura County Transportation CommissionVentura, California

The Ventura County Transportation Commission (VCTC) is soliciting proposals for a five-year contract to provide habitat restoration maintenance and monitoring services for the Sespe Creek Overflow railroad bridge repair project. The selected consultant will implement a maintenance program including non-native weed removal, irrigation system maintenance, erosion control maintenance, trash and debris removal, and remedial planting/seeding. Monitoring activities will assess restoration progress against established performance standards. Work requires a Restoration Specialist and personnel experienced in Southern California habitat restoration. The consultant must obtain annual Roadway Worker Protection training for Sierra Northern. Proposals are due by December 16, 2026, at 4:00 PM PT and must be submitted via email to [email available with Pro]. The contract term is anticipated to be 5 years.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 17, 2026
Submission
email
Contract term
January [DATE], 2027 - December 31, 2031
Documents analyzed
2

Steps to Bid

  1. 1

    Submit proposals via email to [email available with Pro].

    Proposals must be received by Wednesday, December 16, 2026, no later than 4:00 PM Pacific time.

What you'll need

Contract duration

5-year term

Submission

Email

How to submit

Submit proposals as a single PDF. Submit a Cost Proposal with a Fee Schedule as a separate PDF.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 8 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Ventura County Transportation Commission (VCTC) is seeking proposals from qualified firms for habitat restoration maintenance and monitoring support, in line with California Department of Fish and Wildlife (CDFW) requirements, for the Sespe Creek Overflow railroad bridge repair project on the Santa Paula Branch Line (SPBL) west of Fillmore. The selected Consultant will provide services to maintain and monitor plants and habitat as specified in the Habitat Restoration Plan - Sespe Creek Rail Bridge Repair Project (ITP No. 2081-2025-078-05) dated September 2026 and accepted by CDFW. Tasks include conducting a five-year maintenance program designed to support the establishment of native habitat in the restoration areas by performing non-native weed removal, irrigation system maintenance, erosion control maintenance, trash and debris removal, and any remedial measures deemed necessary for the success of the restoration program (e.g., re-seeding and re-planting). Maintenance activities must be directed by a Restoration Specialist and conducted by qualified personnel who have experience maintaining habitat restoration projects in the Southern California region. Monitoring activities must assess the progress of the restoration effort toward attainment of the stated performance standards outlined in the HRP. The monitoring program includes qualitative maintenance monitoring, and semi-annual quantitative monitoring. Qualitative and quantitative monitoring will be used to determine the success of the restoration effort and to make adaptive management decisions, if necessary. Work is adjacent to an active rail corridor and Consultant will be required to obtain Roadway Worker Protection for Sierra Northern on a yearly basis per the Federal Railroad Administration (FRA) 49 Code of Federal Regulations (CFR) Part 214, Subpart C requirements. Deliverables include weed control, irrigation system maintenance, erosion control maintenance, trash and debris removal, remedial planting and seeding, and channel and bank condition maintenance completed according to the Scope of Work, Table 5: Maintenance Schedule, PEP, Years 1-2, and Years 3-5; quantitative and qualitative restoration monitoring conducted in accordance with the methods and schedule described in the Scope of Work; and Qualitative and Quantitative Monitoring Reports as described in the Scope of Work. VCTC anticipates awarding a lump sum contract with a 5-year term. The selected firm will be required to execute VCTC's standard professional services agreement and meet its insurance requirements. Proposals should include a brief workplan, identified personnel available including the assigned Restoration Specialist, and firm and personnel qualifications. A Cost Proposal with a Fee Schedule should be submitted as a separate PDF, including hourly rates by classification, reimbursable expenses, and any proposed escalation. Proposals must be submitted via email to [email available with Pro] and received by Wednesday, December 16, 2026, no later than 4:00 PM Pacific time.

Key dates

Bids due
Dec 17, 2026

Documents

  • Sespe-Creek-HRP-Maintenance-Monitoring-RFP-Template-Contract-Scope-of-Work.pdf31 pages
  • Sespe-Creek-Rail-Bridge-Repair-Habitat-Restoration-Plan-09.24.2026.pdf43 pages

See all documents · Download with Pro