OpenRFQCloses Dec 4, 2026
Police Complex Parking Garage Engineering Services
Bristol, City ofConnecticut#2P27-028
This is a Request for Qualifications (RFQA) with no line items or pricing required. Bidders must submit qualifications via BidNet Direct. All vendors may respond.
On PublicBidSearch: the original bid posting and 1 bid document for this bid.
Overview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 1:00 PM Eastern Time
- Submission
- electronic portal
- Documents analyzed
- 1
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Waterproofing system design and specification
- Engineering services for construction document preparation
- Bidding assistance and construction phase support
- Technical evaluation and reporting for structural integrity
Steps to Bid
What you'll need
Submission
Electronic portal
NAICS
541330, 541370
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Responses must be submitted via the City's bid platform, BidNet Direct, at [link available with Pro]. The solicitation is for qualifications only; no pricing is required at this stage.
Key dates
- Bids due
- Dec 4, 2026
Documents
- 2P27-028_Nov_13_26_solicitation_doc.pdf4 pages
More from this agency
- Automated Side Loader Refuse Truck · closes Nov 30, 2026
- Snow Plowing Operations · closes Dec 1, 2026
- Annual Requirements for Traffic Signs & Related Materials · closes Dec 4, 2026
Similar bids in Connecticut
- Kenosia Well Field PCE and PFAS Treatment Upgrades · closes Jan 14, 2027
- Transportation Engineering Design Services – Route 174 Congestion Mitigation and Safety Improvements · closes Dec 3, 2026
- Architectural & Engineering Services for Generator Replacement at Toquam Elementary School · closes Dec 17, 2026
- On-Call - Geotechnical Engineering · closes Dec 8, 2026
- On-Call - Civil Engineering · closes Dec 10, 2026
Closing soon in Connecticut
- Bathymetric & Subsurface Survey on the Cos Cob Alternatives Analysis · closes Nov 25, 2026
- Ansonia Train Station Area Improvements · closes Nov 30, 2026
- Replacement of Pine Tree Drive and Peck Lane Culverts Over Tumble Brook · closes Dec 1, 2026
- Energy Resilience Construction Grants · closes Dec 1, 2026
- Pump-Out Boat Outboard Engine Replacement · closes Dec 1, 2026