Transportation Engineering Design Services – Route 174 Congestion Mitigation and Safety Improvements
New Britain, City ofConnecticut#27-012
The City of New Britain is seeking qualified engineering consulting firms to provide design and project management services for the Route 174 Congestion Mitigation and Safety Improvements Project. The project involves realigning a high-crash intersection from an offset 'Z-curve' configuration to a signalized T-intersection, improving safety and reducing congestion on Route 174. The work includes land surveying, NEPA compliance, property acquisition support, traffic and roadway design, and federal coordination. The City has secured a $14.696 million BUILD Grant from FHWA, with a deadline to obligate funds by September 30, 2030. Firms must have experience with federally funded projects, CTDOT standards, and NEPA processes.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 3, 2026
- Time stated in bid documents
- Dec 3, 2026, 12:00 PM Eastern Time
- Submission
- Documents analyzed
- 2
Scope of work
- Improve safety and reduce crash risk for all users
- Reduce congestion and improve traffic flow on Newington Avenue, East Street, and East Main Street
- Coordinate with City-owned redevelopment site and private developer
- Ensure compliance with FHWA BUILD Grant requirements and federal funding deadlines
Steps to Bid
- 1
Review the solicitation documents and project background.
What you'll need
Contract duration
The project must be completed in time to meet the FHWA BUILD Grant obligation deadline of September 30, 2030.
Submission
NAICS
541330
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project will improve safety, reduce congestion, and enhance mobility for motorists, pedestrians, transit riders, and emergency responders. The realignment will affect approximately 480 linear feet of Newington Avenue, 390 linear feet of East Street, and 622 linear feet of East Main Street. Firms must demonstrate capacity to manage complex, multi-agency projects under tight deadlines.
Key dates
- Pre-bid meeting
- Nov 19, 2026, 12:00 PM Eastern Time
- Bids due
- Dec 3, 2026
Documents
- 27-012_Nov_3_26_solicitation_doc.pdf5 pages
- 27-012CongestionMitigationRFQ.pdf12 pages
More from this agency
- Elevator Maintenance Services for City Buildings and Garages · closes Dec 1, 2026
Similar bids in Connecticut
- Architectural & Engineering Services for Generator Replacement at Toquam Elementary School · closes Dec 17, 2026
- On-Call - Geotechnical Engineering · closes Dec 8, 2026
- On-Call - Civil Engineering · closes Dec 10, 2026
- Design and Engineering Services for Replacement of the Footbridge · closes Dec 10, 2026
- RFP - Engineering On-Call Services · closes Dec 15, 2026
Closing soon in Connecticut
- Replacement of Pine Tree Drive and Peck Lane Culverts Over Tumble Brook · closes Dec 1, 2026
- Request for Qualifications: RPGL-2027-24 Master Sewer Plan Engineering Services · closes Dec 3, 2026
- Hope Street Culvert Repair — Invitation to Bid · closes Dec 3, 2026
- Replacement of Suffield Street Bridge Over Unnamed Brook · closes Dec 3, 2026
- Commercial Refrigeration and Foodservice Equipment Repair and Preventive Maintenance Services · closes Dec 3, 2026