Project R-1: 2026 Roof Replacement & Related Work @ Lindley E.S. & Study E.S.
Fort Wayne Community SchoolsIndiana#101894
Fort Wayne Community Schools is soliciting sealed bids for the 2026 roof replacement and related work at Lindley E.S. and Study E.S. The project includes removal and replacement of existing roof systems with a new 2-ply cold adhesive Modified Bitumen Roof (MBR) System on specified areas. Work must be completed by September 17, 2027. Bids must be submitted by 2:00 PM local time on November 17, 2026, at the Fort Wayne Community Schools Facilities Department. A pre-bid meeting is scheduled for November 3, 2026, at 10:00 AM. A $100 refundable deposit is required for each set of plans and specifications. Bids must include a bid bond equal to 5% of the bid amount. Performance and payment bonds in the amount of 100% of the contract value are required within 10 days of contract execution. Contractors must comply with school operating hours, noise, dust, and safety restrictions. Site visits are required prior to bidding. All documents are available via the Eastern Engineering Virtual Planroom.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Nov 17, 2026
- Time stated in bid documents
- Nov 17, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 120 calendar days from NTP
- Documents analyzed
- 3
Scope of work
- Install new roof deck, insulation, base and cap ply membranes, flashing, and accessories.
- Comply with AIA A201-2017, AIA A701-2018, and local codes.
Steps to Bid
- 1
Register and sign in at the Eastern Engineering Virtual Planroom to access the full set of plans and specifications.
- 2
Pay a $100 refundable deposit to Fort Wayne Community Schools for each complete set of documents.
- 3
Attend the pre-bid meeting on November 3, 2026, at 10:00 AM in the Facilities Department Training Room, 1519 Catalpa Street, Fort Wayne, IN 46802. was Nov 3, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Review all documents, including the addenda, and verify existing conditions on site prior to bidding.
- 5
Prepare and submit a sealed bid, including the completed bid form, bid bond, and all required documents, by 2:00 PM local time on November 17, 2026. was Nov 17, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Mail, Hand delivery
NAICS
236220
Get alerts for bids like this
New roofing bids in Indiana
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Project R-1: 2026 Roof Replacement and Related Work at Lindley Elementary School (2201 Ardmore Ave, Fort Wayne, IN 46802) and Study Elementary School (2414 Brooklyn Ave, Fort Wayne, IN 46802). Bids must be accompanied by a bid bond in the amount of 5% of the bid total, issued by a surety authorized to do business in Indiana.
Documents
- Project_R-1__2026_Roof_Replacement_Related_Work_Lindley_E.S._Study_E.S_br_Pr.pdf3 pages
- Addendum_1.pdf20 pages
- Addendum_2.pdf5 pages
More from this agency
- Project R-2: 2026 Roof Replacement & Related Work @ Indian Village E.S. & Maplewood E.S. — closes Nov 18, 2026
- Project R-3: 2026 Roof Replacement & Related Work @ CAS @ Nebraska — closes Nov 19, 2026
- Anthis and FACE Site Improvements — closes Dec 1, 2026
- Anthis and FACE Site Improvements — Bid 101897 — closes Dec 1, 2026
- North Side High School Early Childhood Center — Construction Project — closes Dec 10, 2026
Similar open bids
- Notice to Bidders: Replacement of sections of roofing at Jasper High School — Greater Jasper Consolidated School Corporation
- Notice to Bidders: Jasper High School Natatorium & Chemical Room Roof Replacement Project 2027 Jasper High School — Greater Jasper Consolidated School Corporation
- Notice to Bidders: Replacement of sections of roofing at John R. Wooden Middle School — MSD of Martinsville
Closing this week nearby
- Asphalt, Concrete, and Stone for Public Works Repairing Streets and Sidewalks in Berne, Indiana — closes Nov 18, 2026
- Gasoline and Fuel Supply — 13,000 Gallons, Regular Unleaded, 10% Ethanol Max — closes Nov 18, 2026
- Request for Proposals: West Lafayette Solar Initiative Part 2 — closes Nov 18, 2026
- Solar Initiative Part 2 – Public Safety Center & Fire Station No. 3 — closes Nov 18, 2026
- North Side Elevated Water Storage Tank Project — Construction Bid — closes Nov 18, 2026