ClosedConstruction

Project R-2: 2026 Roof Replacement & Related Work @ Indian Village E.S. & Maplewood E.S.

Fort Wayne Community SchoolsIndiana#101895

Fort Wayne Community Schools is soliciting sealed bids for the 2026 Roof Replacement and Related Work at Indian Village E.S. and Maplewood E.S. The scope includes removal and replacement of existing roof systems with a new 2-ply cold adhesive Modified Bitumen Roof (MBR) System on specified areas at both schools. Bids must be submitted by 2:00 PM local time on November 18, 2026, to the Facilities Department at 1519 Catalpa Street, Fort Wayne, IN 46802. A pre-bid meeting is scheduled for November 3, 2026 at 10:00 AM. A $100 refundable deposit is required for each complete set of plans and specifications, available through the Eastern Engineering Virtual Planroom. Bids must include a bid bond equal to 5% of the bid amount. Performance and payment bonds in the amount of 100% of the contract value are required from the successful bidder within 10 days of contract execution. Work is scheduled to begin May 27, 2027, with substantial completion for tear-off and base ply by July 21, 2027, metal flashing by August 27, 2027, and final completion by September 17, 2027. Contractors must comply with all site access, occupancy, and work-hour restrictions.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Nov 18, 2026
Time stated in bid documents
Nov 18, 2026, 2:00 PM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
three (3) years + two additional one-year renewal terms
Documents analyzed
3

Scope of work

  • Remove and replace existing roof system at Indian Village E.S. with new 2-ply cold adhesive Modified Bitumen Roof (MBR) System on Areas <13>, <14>, <15>, and <1
  • Comply with all drawings and specifications prepared by Martin-Riley Architects Engineers
  • Coordinate with Owner’s Project Coordinator and comply with all site access, occupancy, and work-hour restrictions

Steps to Bid

  1. 1

    Register and sign in to the Eastern Engineering Virtual Planroom to access the full set of plans and specifications.

  2. 2

    Pay a $100 refundable deposit to Fort Wayne Community Schools for each complete set of documents.

  3. 3

    Attend the pre-bid meeting on November 3, 2026 at 10:00 AM in the Facilities Department Training Room at 1519 Catalpa Street, Fort Wayne, IN 46802. was Nov 3, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Review all contract documents, including Addendum One and Addendum Two, and ensure compliance with all requirements.

  5. 5

    Prepare and submit a sealed bid, including a certified check, cashier’s check, or bid bond in the amount of 5% of the bid total, payable to Fort Wayne Community Schools. was Nov 18, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  6. 6

    Submit the bid in person to the Fort Wayne Community Schools Facilities Department at 1519 Catalpa Street, Fort Wayne, IN 46802, by 2:00 PM local time on November 18, 2026. was Nov 18, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Mail, Hand delivery

NAICS

236220

How to submit

Bids must be submitted in sealed envelopes to the Fort Wayne Community Schools Facilities Department at 1519 Catalpa Street, Fort Wayne, IN 46802, by 2:00 PM local time on November 18, 2026. Bids received after that time or in another location shall be returned unopened.

In person/mail: 1519 Catalpa Street, Fort Wayne, IN 46802

Get alerts for bids like this

New roofing bids in Indiana

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

All work must be performed in accordance with the contract documents, including the Addendum One and Addendum Two dated November 13 and November 16, 2026.

Documents

  • Project_R-1__2026_Roof_Replacement_Related_Work_Lindley_E.S._Study_E.S_br_Pr.pdf3 pages
  • Addendum_1.pdf20 pages
  • Addendum_2.pdf5 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby