OpenConstructionCloses Dec 17, 2026

Shasta District Fair Resilience Center – Kitchen Construction

California Construction AuthorityPleasanton, California#027-23-084

The Shasta District Fair Resilience Center – Kitchen project involves construction of a 1,582-square-foot kitchen building with full mechanical, plumbing, electrical, fire protection, and foodservice systems. Site improvements include accessible parking, sidewalks, a propane tank, and landscaping. A 10% bid security is required. The successful bidder must provide 100% performance and payment bonds. Bids are due December 17, 2026, at 2:00 PM Pacific Time, submitted electronically via Public Purchase. Questions must be submitted by December 8, 2026.

On PublicBidSearch: the original bid posting and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 2:00 PM Pacific Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Required submission items
5 items · full checklist with Pro

Scope of work

  • Construct 1,582 sq ft kitchen building with kitchen, receiving, dishwashing, restroom, electrical, and fire riser rooms
  • Include selective demolition, foundations, structural framing, and architectural finishes
  • Install mechanical ventilation, hood systems, plumbing, electrical, lighting, and fire protection
  • Provide foodservice equipment and associated utilities
  • Price Additive Alternate #1 (ADD ALT-A) separately for equipment on Sheet A-253

Steps to Bid

What you'll need

Contract duration

240 calendar days from Notice to Proceed

Submission

Electronic portal

NAICS

236220, 236221

How to submit

Submit bids electronically through Public Purchase using the required CCA bid forms. Bid security must be submitted with the bid.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 5-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Construction of a new approximately 1,582-square-foot kitchen building at 1890 Briggs Street, Anderson, CA 96007, for the Shasta District Fair Resilience Center. Provide separate pricing for Additive Alternate #1 (ADD ALT-A), consisting of equipment designated on Sheet A-253, as specified in the bid documents. Contract duration: 240 calendar days after Notice to Proceed. Bids must be submitted electronically via Public Purchase using required CCA bid forms.

Key dates

Questions due
Dec 8, 2026, 2:00 PM Pacific Time
Bids due
Dec 17, 2026

More from this agency

Similar bids near Pleasanton

Closing soon near Pleasanton