Alcosta Senior & Community Center Outdoor Handrail Replacement (CIP #955584)
City of San RamonSan Ramon, California
The City of San Ramon is soliciting proposals for the replacement of approximately 630 linear feet of outdoor handrail at the Alcosta Senior & Community Center. The work includes removal of existing handrail, fabrication and installation of new handrail from 1-1/4 inch ASTM A53 Schedule 40 galvanized steel pipe, and installation of skate block guards. All work must comply with the California Building Code and ADA standards. The Contractor must submit a firm, fixed lump-sum price, with a breakdown of unit prices per linear foot. A mandatory pre-submittal meeting is scheduled for November 9, 2026, at 10:00 a.m. at the project site. Questions must be submitted via email to Matt Ramirez by 9:00 a.m. on November 20, 2026. Proposals must be received by the City by December 3, 2026, at 2:00 p.m. The Contractor must be licensed as a C-13 Fencing Contractor or B General Building Contractor by the California Contractors State License Board.
Overview
- Due
- Dec 4, 2026
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery, overnight delivery
- Contract term
- 6 months + one additional one (1) year term
- Documents analyzed
- 1
Scope of work
- Install Ravensforge Skate Block Handrail Guards at 2-foot intervals
- Core drill and epoxy grout post settings per City-approved drawings
- Provide temporary barriers and signage to maintain safe, ADA-compliant access
- Submit shop drawings and color samples for City approval prior to fabrication and coating
Steps to Bid
- 1
Attend the mandatory pre-submittal meeting on November 9, 2026, at 10:00 a.m. at the Alcosta Senior & Community Center, 9300 Alcosta Boulevard, San Ramon, CA 94583. Failure to attend will result in the proposal being disregarded. by Nov 9, 2026, 10:00 AM
- 2
Submit questions via email to Matt Ramirez, Program Manager, at [email available with Pro] by 9:00 a.m. on November 20, 2026. by Nov 20, 2026, 9:00 AM
- 3
Ensure all required licenses are held, including a C-13 Fencing Contractor or B General Building Contractor license from the California Contractors State License Board.
What you'll need
Submission
Mail, Hand delivery, Overnight delivery
NAICS
238290, 238990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
All work must comply with the California Building Code (CBC) Chapter 11B and ADA Standards for Accessible Design. The new handrail must be powder-coated to match the existing color, with touch-up for field welds and cuts. Posts must be core-drilled into existing concrete to specified depths, grouted with epoxy, and cured per manufacturer requirements. Work must be phased to complete each section in a single workday, with no overnight or incomplete sections. The Contractor must coordinate with the City’s Project Manager and provide five business days’ notice before starting any new section. The proposal must include a firm, fixed lump-sum price, with a breakdown of unit prices per linear foot, including all labor, materials, equipment, supervision, permits, disposal, site restoration, traffic control, and incidental costs.
Key dates
- Questions due
- Nov 20, 2026, 9:00 AM Pacific Time
- Pre-bid meeting
- Nov 9, 2026, 10:00 AM Pacific Time
- Bids due
- Dec 4, 2026
- Expected award
- Dec 16, 2026
Documents
- OUTDOOR_HANDRAIL_REPLACEMENT_-_ASCC_RFP_-_FINAL_-_SIGNED.pdf43 pages
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- Picnic Tables with Back Support – Request for Informal Quotation — closes Nov 13, 2026
- Monarch Playground Upgrades and Replacement — closes Dec 8, 2026
Similar open bids
- STANTON COMMUNITY AND SENIOR CENTER UPGRADES PROJECT — City of Stanton
- Vertical Turbine Can Pumps for Sierra Pines Regional Water Treatment Facility — Tuolumne Utilities District
- Haul-Out, Welding, and Launch Services for 47-Foot Motor Lifeboat (MLB) 47237 – Port Quarter Repair — US COAST GUARD
- Well No. 10 GAC Treatment and System Upgrades — City of Norwalk
- Seismic Steel Strengthening for 5210 Pacific Concourse Drive Tenant Improvements (BP 08) — University of California, Los Angeles
Closing this week nearby
- Abatement of Dilapidated Lakebed Structures #01 — closes Nov 7, 2026
- Purchase of One New Chevrolet Silverado EV Work Truck with Extended Range Battery or Equivalent All-Electric Pickup… — closes Nov 7, 2026
- Strategic Plan Update Consulting Services — closes Nov 7, 2026
- Development of 710 Hamilton St. Redwood City, CA — closes Nov 7, 2026
- Abatement of Dilapidated Lakebed Structures — closes Nov 7, 2026