Maspeth Town Hall HVAC Upgrade Replacement - Special Inspections
Department of Design and ConstructionNew York#85027Y0187
This project involves replacing the existing HVAC system with a new VRF system, including upgrades to attic AC units, attic modifications, wall insulation, and new radiators. The HVAC scope includes new cellar and attic VRF units, controls, refrigerant piping, and condensate drains, as well as a new cellar Dedicated Outside Air System (DOAS) and an attic DOAS. Existing ductwork will be modified, and new insulation will be installed. Electrical work includes reconfiguring distribution, a new sub-panel, and new wiring for HVAC units. Fire protection modifications and new fire alarm tie-ins are required. Selective demolition of existing HVAC components and ductwork is included. The project has a not-to-exceed amount of $58,541.00 and an anticipated construction duration of 408 consecutive calendar days. Special inspections are required for various construction elements as per the NYC Building Code.
On PublicBidSearch: the original bid posting, 16 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 24, 2026
- Time stated in bid documents
- Nov 24, 2026, 2:00 PM Eastern Time
- Submission
- electronic portal
- Contract term
- The Contract shall commence as of the date set forth in the Notice to Proceed and shall remain in effect for the period set forth in Exhibit A.
- Documents analyzed
- 16 published · 13 analyzed
Scope of work
- Replace attic AC units and reconfigure attic opening and ladder.
- Replace existing subfloor and batt insulation in attic.
- Provide wall insulation and convector for radiator in first floor office.
- Install new VRF split-air cooled cassettes in cellar with associated ductwork, piping, and controls.
- Replace existing HVAC units at south driveway with new, including concrete pad and vibration isolator.
- Replace existing concrete slab and fence at south driveway.
Steps to Bid
What you'll need
Contract duration
408 consecutive calendar days
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 8 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project involves replacing the existing heating, ventilation, and air conditioning (HVAC) system with a new variable refrigerant flow (VRF) system for the cellar and first floor of the Maspeth Town Hall. Existing attic return fans will be replaced. New ductwork insulation will be provided on modified main sections of supply and return ducts and existing ductwork with disturbed insulation. A cellar 10-ton Dedicated Outside Air System (DOAS) evaporator will be installed in the classroom adjacent to the boiler room. The existing west/front elevation louver and opening will be modified, enlarged, and raised for new cellar DOAS and boiler ventilation, including a new motorized damper and ductwork. An attic 10-ton DOAS evaporator will be connected to existing outside air ductwork, with an electric duct heater for tempered OA intake during cold conditions and a motorized damper on the OA intake duct. A multi-zoned DOAS condenser for cellar and attic units will be located in the south driveway. Existing attic electric duct heaters will be removed. All existing and modified ductwork will be commissioned, tested, and balanced. Existing kitchen, toilet, and attic exhaust systems will remain. A new first-floor office radiator will be installed in the northwest corner, including necessary coring and piping. Sprinkler systems will be modified as necessary for new ductwork and removed soffits. The electrical distribution will be reconfigured, and a new 400A sub-panel will be provided for new HVAC loads in the cellar electrical room. Existing equipment wiring, including exposed conduit, will be removed. Power wiring (existing risers to remain) inside and new conduits/wiring outside will be provided. A main shutoff switch and phase loss protection circuit will be installed. New circuit breakers/disconnects and control wiring for HVAC units will be provided. New LED light fixtures will be installed at new condenser units. Conduit will be concealed in the building. New duct smoke detectors and HVAC shutdown with wiring from HVAC units to the fire alarm control panel will be provided, and the fire alarm control panel will be modified and reprogrammed. Fire alarm safety tie-ins will be installed in compliance with current codes. The project includes selective demolition of existing AC vertical evaporators, outdoor condensing units, refrigerant pipes, and sections of main supply and return ductwork in the basement. In the attic/first floor, existing AC units, return fans, electric duct heaters, refrigerant pipes, and sections of supply and return ductwork will be removed.
Key dates
- Bids due
- Nov 24, 2026
Documents
- PWQMAHVAC_DOB_Approved_MH_Dwgs.pdf
- PWQMAHVAC_DOB_Approved_GC_Dwgs_260616.pdf
- MWBE_S.I_Project_Specific_Contract_PWQMAHVAC_1_.pdf40 pages
- PWQMAHVAC_DOB_Approved_SP_Dwgs.pdf
- PWQMAHVAC_DOB_Approved_ST_Dwgs.pdf9 pages
- PWQMAHVAC_Volume3_1_.pdf369 pages
- RFI_Response_Form-PWQMAHVAC.pdf21 pages
- PWQMAHVAC_-Special_Inspections_Memo.pdf5 pages
8 more files
More from this agency
- Replacement of Concrete, Steel Faced and Granite Curbs and Related Sidewalk and Roadway Restoration — closes Dec 2, 2026
- Replacement of Concrete, Steel Faced and Granite Curbs and Related Sidewalk and Roadway Restoration — closes Dec 2, 2026
- Southern Boulevard Bicycle and Pedestrian Safety Improvements, The Bronx — closes Dec 3, 2026
- PW348-91,-94_RC for CM/Design/Build for Petroleum Storage Tank Sumps, Citywide — closes Dec 3, 2026
- Safe Routes to Schools Improvements in Queens — closes Dec 7, 2026
Similar open bids
- Reconstruction of Paerdegat Pumping Station — DEPARTMENT OF ENVIRONMENTAL PROTECTION
- Replace Physical Plant Boilers #2 and #3 — A/E Design/Consulting Services — SUNY Farmingdale State Coll
- Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC — VETERANS AFFAIRS, DEPARTMENT OF
- Mechanical Treatments of Prescribed Burn Units and Fuel Breaks — ENERGY, DEPARTMENT OF
- Removal and Replacement of Attic Ventilation Fans at USCG Station Fire Island, New York — US COAST GUARD
Closing this week nearby
- Corinth CSD 2026-2027 Capital Outlay REBID — closes Nov 20, 2026
- Replacement of the boiler and associated piping at the Volunteer Firemen's Museum — closes Nov 20, 2026
- Drainage Improvement Project — Village of Waterloo, New York — closes Nov 20, 2026
- Snowplowing Parking Lots and Shoveling Sidewalks at Various Branch Locations in Erie County — closes Nov 20, 2026
- Water Street Drainage Project — closes Nov 20, 2026