Replace Physical Plant Boilers #2 and #3 — A/E Design/Consulting Services
SUNY Farmingdale State CollNew York#261079-00
The project involves replacing two aging boilers with high-efficiency models, upgrading control systems, evaluating and potentially upgrading water treatment, fuel oil quality management, and primary electrical infrastructure (transformer switchgear and emergency generator). Hazardous materials removal is included. The estimated construction value is $12,987,000. The solicitation is for A/E (design/consulting) services. Bidders must be qualified consultants with relevant experience in mechanical systems and campus energy infrastructure.
On PublicBidSearch: the original bid posting and 1 bid document for this bid.
Overview
- Due
- Dec 15, 2026
- Time stated in bid documents
- Dec 15, 2026, 3:00 PM Eastern Time
- Submission
- online portal
Scope of work
- Replace Boilers #2 and #3 with two new high-efficiency, flexible-temperature boilers
- Install new boiler control systems for all four boilers
- Assess and potentially replace transformer switchgear and emergency generator
- Remove associated hazardous materials from the Heating Plant
- Provide design and construction administration services for the project
Steps to Bid
What you'll need
Submission
Online portal
NAICS
541330, 541370
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The Heating Plant is a 14,806 GSF facility constructed in 1950, serving as the campus's primary source of steam generation for heating and domestic hot water. The existing plant contains four steam boilers; Boilers #2 and #3 have reached the end of their useful life and present increasing operational and maintenance concerns. Work will also include evaluation and potential upgrades to supporting plant systems, such as water treatment improvements and fuel oil quality management. 261079-00. Statements of Qualifications must be submitted to SUCF via the SUCF Procurements Advertised page and linked project detail.
Key dates
- Bids due
- Dec 15, 2026
Documents
- rfq-registration
Similar open bids
- Maspeth Town Hall HVAC Upgrade Replacement - Special Inspections — DEPARTMENT OF DESIGN AND CONSTRUCTION
- Reconstruction of Paerdegat Pumping Station — DEPARTMENT OF ENVIRONMENTAL PROTECTION
- Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC — VETERANS AFFAIRS, DEPARTMENT OF
- Mechanical Treatments of Prescribed Burn Units and Fuel Breaks — ENERGY, DEPARTMENT OF
- Removal and Replacement of Attic Ventilation Fans at USCG Station Fire Island, New York — US COAST GUARD
Closing this week nearby
- Corinth CSD 2026-2027 Capital Outlay REBID — closes Nov 20, 2026
- Replacement of the boiler and associated piping at the Volunteer Firemen's Museum — closes Nov 20, 2026
- Drainage Improvement Project — Village of Waterloo, New York — closes Nov 20, 2026
- Snowplowing Parking Lots and Shoveling Sidewalks at Various Branch Locations in Erie County — closes Nov 20, 2026
- Water Street Drainage Project — closes Nov 20, 2026