Gary Metro Center Station Design Request for Qualifications (RFQ)
Northwest Indiana Regional Development AuthorityIndiana
The Northwest Indiana Regional Development Authority is seeking a qualified architectural and engineering firm to serve as architect and engineer of record for the redesign of the Gary Metro Center Station and a new multi-modal transit hub and parking structure. The project is located east of the existing station and north of 4th Avenue in Gary, Indiana. The selected firm will lead final design, environmental clearance (Phase 1 and 2 required; Phase 3 if contamination is found), advanced engineering, and pre-construction services. The RDA will separately procure a Construction Manager as Constructor. The firm must include landscape architecture and civil engineering. The MKSK visioning report may be used as a backdrop. No existing studies or assessments are available. The RDA will not accept overall fees; hourly rates must be included. The proposal must be submitted electronically via a file share. A virtual interview is scheduled for November 16, 2026.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Submission
- email, file share
- Documents analyzed
- 2 published · 1 analyzed
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Pre-construction services including cost estimating, constructability reviews, and scheduling
- Assistance with interfacing with rail and transit operators
Steps to Bid
- 1
Review the RFQ and all attachments, including the MKSK visioning report and the sample modified AIA B133 agreement.
- 2
Prepare a proposal that includes qualifications, relevant project experience (within the past five years), team structure, and hourly rates for each position.
- 3
Submit the proposal electronically via a file share if possible. The RDA has no preferred file format or page limit.
- 4
Attend the virtual interview on November 16, 2026, if required. was Nov 16, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Insurance
RequiredThe selected firm will need to assist the RDA in determining the necessary environmental compliance requirements and documentation.
Submission
Email, File share
NAICS
541330
How to submit
Respondents should submit their response in a format that is efficient and conveys the respondents' qualifications. The RDA has no preferred file formats or page limits. If possible, the establishment of a file share may be necessary. Hourly rates should be included in the RFQ response. The rates may be incorporated in the response or as a separate document. The hourly rates of sub-contractors are not required. The RDA will not accept overall fees; hourly rates are requested to gain a general understanding of the relative competitiveness of the various respondents.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 7 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Respondents must include landscape architecture and civil engineering disciplines in their team. The RDA intends to separately procure a Construction Manager as Constructor under IC 5-32. The project will be funded with state and local funds. There is no construction budget set yet; the selected architect and construction manager will assist in setting the maximum budget. The existing consultants, Policy Analytics, LLC and MKSK, will remain on the owner side and collaborate with the selected team. No existing station assessments, studies, or investigations are available for this RFQ. The RDA has no preferred file format, page limit, or submission deadline. The selected firm will continue to provide services beyond final design, including bidding and construction administration.
Documents
- Gary_Metro_Center_Station_RFQ_QA_with_responses.10.29.26_final.xlsx
1 agency-portal link
Similar bids in Indiana
- Request for Proposals — Brown, Monroe, and Owen Counties Seeking EDD Designation via U.S. EDA
- Request for Proposals: Downtown Bloomington Corridor and Subarea Planning Study with Shared Street Design on Kirkwood… · closes Dec 10, 2026
- Request for Qualifications: Architect/Engineer Services · closes Dec 18, 2026
- Diatom Identification Services · closes Dec 28, 2026
- Procurement of Design and Production of Flat Railcars · closes Dec 9, 2026
Closing soon in Indiana
- Gasoline and Diesel Fuel Supply for Jackson County Vehicles, 2027 · closes Nov 30, 2026
- Purchase of Gasoline, Diesel Fuel, and Diesel Exhaust Fluid for Jackson County, Indiana — 2027 · closes Nov 30, 2026
- Work and Supply of Materials for the Concord High School Fieldhouse BP #2 · closes Dec 3, 2026
- Request for Proposal: Network Hardware and Installation of Wireless Access Points · closes Dec 3, 2026
- Bituminous Surfacing of French Ridge Road and Scotch Pine Road, Perry County, Indiana · closes Dec 4, 2026