Replace Mechanical Equipment, Multiple Assets at Fulton State Hospital
Missouri Office of Administration - Division of Facilities Management — Fulton State HospitalFulton, Missouri#M2418-01
Bidders must submit electronic bids by 1:30 PM on January 7, 2027, to [email available with Pro]. A pre-bid meeting is scheduled for December 11, 2026, at 600 East 5th Street, Fulton, MO.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 7, 2027, 11:59 PM CT
- Submission
- Contract term
- 360 working days from the Notice of Intent to Award
- Documents analyzed
- 4 published · 2 analyzed
- Required submission items
- 8 items · full checklist with Pro
Scope of work
- Remove and replace existing air handling units at Fulton State Hospital
- Perform abatement in the Guhleman mechanical rooms
- Construct a new chilled water plant building to house a new chiller and associated mechanical equipment
- Pay prevailing wages to all workers performing work under the contract
Steps to Bid
- 1
Register as a planholder and obtain bid documents from American Document Solutions (ADS) at Official linkPro or via mail at 1400 Forum Blvd., Suite 7A, Columbia, MO 65203. A $100 deposit is required for paper sets; electronic sets are available at no cost.
- 2
Attend the pre-bid meeting on December 11, 2026, at 10:00 AM at 600 East 5th Street, Fulton, MO 65251. Access to the site requires a photo ID. by Dec 11, 2026, 10:00 AM
What you'll need
Insurance
RequiredThe Contractor shall pay not less than the specified hourly rate of wages, as set out in the wage order attached to and made part of the specifications for work under this contract, to all workers performing work under the contract, in accordance with sections 290.210 to 290.340, RSMo. The Contractor shall forfeit a penalty to the Owner of one hundred dollars per day (or portion of a day) for each worker that is paid less than the specified rates for any work done under the contract by the Contractor or by any subcontractor, in accordance with section 290.250, RSMo.
Contract duration
360 working days from the Notice of Intent to Award
Submission
NAICS
238290, 238210
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 8-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project includes site preparation, structural work, mechanical installation, electrical connections, and compliance with Missouri prevailing wage laws and federal labor standards. Liquidated damages of $1,000 per working day apply for delays beyond the completion deadline.
Key dates
- Pre-bid meeting
- Dec 11, 2026, 10:00 AM Central Time
- Bids due
- Jan 7, 2027, 11:59 PM CT
Documents
- M2418-01_Final_Bid_Documents.pdf18 pages
- M2418-01_IFB.pdf1 pages
- M2418-01_Bid_Plans.pdf139 pages
- M2418-01_Final_Bid_Specs.pdf
More from this agency
- Reclaim & Stabilize Marsh Phase 1 Campgrounds – Big Lake State Park · closes Dec 1, 2026
- Renovate CCC Restroom into Cabin at Washington State Park, Desoto, Missouri · closes Dec 3, 2026
- HVAC and Interior Renovation · closes Dec 8, 2026
- Install New HVAC · closes Dec 10, 2026
- Renovate Interior to Create Storage · closes Dec 10, 2026
Similar bids near Fulton
- Planned Maintenace RFP - SBC · Ashland · closes Dec 10, 2026
Closing soon near Fulton
- Pest Control Services – Term and Supply · Columbia · closes Nov 30, 2026
- Combustion & Steam Turbine Generator Maintenance Services · Columbia · closes Nov 30, 2026
- Boone County - Route AC - Roadway Improvements · Boone County · closes Nov 30, 2026
- UMKC Fuel Oil - Request for Bid · Columbia · closes Dec 1, 2026
- Armored Car Services for City of Columbia, Missouri · Columbia · closes Dec 1, 2026