Replace Traffic Signals at King Hill Avenue and Route 752
Missouri Department of Transportation — MoDOTMissouri#261218-A03
This project involves replacing traffic signals at the intersection of King Hill Avenue and Route 752 in Buchanan County, MO. Bids are due electronically via Bid Express by 11:00 AM local time on December 18, 2026. The project is state-funded and requires compliance with prevailing state wage rates. A bid bond of 5% or more of the bid amount is required. Bidders must be prequalified at least seven days prior to the bid opening. Insurance requirements are detailed in the specifications.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026, 11:00 AM CT
- Time stated in bid documents
- Dec 18, 2026, 11:00 AM Central Time
- Bid bond
- 5%
- Submission
- electronic portal
- Contract term
- May 15, 2027
- Documents analyzed
- 5 published · 4 analyzed
Scope of work
- Install new signal heads, signs, mounting hardware, and luminaires.
- Install controller assembly housing, pushbuttons, and conduit.
- Install various types of cable, pull boxes, and concrete base.
- Remove existing signal/lighting and network equipment and deliver to specified location.
Steps to Bid
- 1
Submit completed Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening.
See Secs 101-103 of the Missouri Standard Specifications for Highway Construction, and Rule 7 CSR 10-15.010, "Prequalification to Bid of Certain Contractors". Questionnaire and Contact information are provided on MoDOT's website.
- 2
Submit bids electronically using "Bid Express Secure Internet Bidding" at Official linkPro. by Dec 18, 2026, 11:00 AM
Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction.
- 3
Submit a Bid Guaranty meeting the requirements of Sec 102 of the Missouri Standard Specifications for Highway Construction.
If submitting a project specific or annual bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bond forms are also available on MoDOT's website. Annual bid bonds shall be executed by June 15th of each year.
- 4
Submit the Subcontractor Disclosure Form in accordance with the bidding documents.
For bids of more than $2,000,000, each bidder shall submit with each bid a disclosure of the subcontracts that have a subcontract value that is equal or greater than twenty percent of the total project bid or subcontracts that are greater than or equal to $2,000,000. If that information is not available at the time of bid the bidder shall submit the "Subcontractor Disclosure Form" pages with MoDOT on or before 4:00 p.m. of the third business day after the bid opening date.
- 5
Submit the DBE Identification Submittal in accordance with the bidding documents for Federal Projects Only.
What you'll need
Bid security
RequiredBid bonds must be submitted on a form furnished by the Commission, executed by the bidder and corporate surety, and naming the "State of Missouri, Acting by and Through the Missouri Highways and Transportation Commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid.
Prequalification
RequiredAward method
The right is reserved by the Missouri Highways and Transportation Commission to reject any or all bids.
Submission
Electronic portal
How to submit
All bids shall be submitted electronically using "Bid Express Secure Internet Bidding" at Official linkPro. Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction.
In person/mail: Missouri Highways and Transportation Commission, Attention: State Design Engineer/Bid Bond, P.O. Box 270, Jefferson City, MO 65102 or delivered by parcel delivery services, (such as UPS, Fed Ex, DHL, etc.) should be shipped to Missouri Highways and Transportation Commission, Attention: State Design Engineer/Bid Bond, 105 West Capitol Avenue, Jefferson City, MO 65102
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Job JNWM0139: Route 752, Buchanan County. This project involves replacing traffic signals at the intersection of King Hill Avenue and Route 752, covering a total length of 0.027 miles. The project is not federally funded. Work zone traffic management, emergency provisions, and utility coordination are detailed. Existing signal/lighting and network equipment are to be removed and delivered to the Commission’s Northwest District Signal Shop Lot. Pavement marking reconfiguration at the intersection will be performed by the Commission prior to the contractor starting the project. The contract order of work is phased, involving maintaining existing signals, closing King Hill Avenue, closing Route 752, and finally a four-way stop phase. Contractor quality control, including a Quality Control Plan and testing, is required. Lump sum temporary traffic control is a pay item. Buy America requirements for iron, steel, and manufactured products apply, with a waiver for projects below $500,000 in federal financial assistance (though this project is not federally funded). Third-party test waivers for concrete aggregate are outlined. Bidder's List Quote Summary is required for federally funded projects. Training provision requires on-the-job training for developing journeymen, with specific reimbursement processes and liquidated damages for non-compliance. Insurance requirements include Commercial General Liability, Commercial Automobile Liability, Contractor's Pollution Liability, and potentially Aircraft Liability, with specific limits and additional insured endorsements.
Key dates
- Bids due
- Dec 18, 2026, 11:00 AM CT
Documents
- 261218_A03_JNWM0139_BID_BOOK.pdf14 pages
- 261218_A03_JNWM0139_JSP_Roadway.pdf35 pages
- 261218_A03_JNWM0139_PLANS.pdf17 pages
- 261218_Notice_To_Contractors_A03_D02.pdf4 pages
- 261218_Notice_To_Contractors.pdf8 pages
More from this agency
- Resurface Routes D, AF, and Outer Road 44 in Franklin County · closes Dec 18, 2026
- 8 Bridge Rehabilitations on Route C, 7, and 13 in Henry and St. Clair Counties · closes Dec 18, 2026
- Pavement Marking on I-44 in Crawford, Laclede, Phelps, and Pulaski Counties, Missouri · closes Dec 18, 2026
- Resurface 35.886 Miles of Route B and Route C in Bates, St. Clair, and Vernon Counties, Missouri · closes Dec 18, 2026
- Bridge Deck Replacement Over One Hundred and Two River · closes Dec 18, 2026
Similar bids in Missouri
- Route K - St. Francois County - Intersection Improvements at North Wood Drive, Bonne Terre · closes Dec 23, 2026
- City Project #112 Ward and Persels Intersection Improvements · Lees Summit · closes Dec 1, 2026
Closing soon in Missouri
- Courthouse Annex Foundation Drains Construction · closes Nov 30, 2026
- Herbicide QVL SDA 374-0652 · closes Nov 30, 2026
- Haul and Stockpile 2,000 Tons of 1-1/4” Clean Rock — No. 13 Special Road District of Audrain County · closes Nov 30, 2026
- City-wide IDIQ Electrical Services, Installation, Maintenance and Repairs · closes Dec 1, 2026
- Leased Office Space - St. Louis, Missouri · closes Dec 1, 2026