Request for Proposals - E-Rate FY2027 Form 470: Core Switch, Network Racks, Cabling, and Related Components - Bremen Public Schools
Bremen Public SchoolsBremen, Indiana#270003745
Bremen Public Schools is seeking proposals for network infrastructure upgrades under E-Rate FY2027. The project includes two components: (1) supply and installation of new core network switches and related components, and (2) overhaul of existing server racks with new equipment and cabling. Bidders must submit detailed, line-item pricing for all equipment, including equivalent models, with full cost disclosure. Proposals must include references, E-Rate SPIN number, and a contract with E-Rate contingencies. Bids must be submitted via email to Melissa Miller by 2:00 PM local time on December 29, 2026.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 29, 2026
- Time stated in bid documents
- Dec 29, 2026, 2:00 PM Eastern Time
- Submission
- Documents analyzed
- 2
Scope of work
- Supply and install 1 HPE Aruba CX 6300M 48-port 1GbE Class4 PoE and 4-port SFP56 Switch
- Supply and install 3 HPE Aruba 50G SFP56 to SFP56 Direct Attach Copper Cables (0.65m)
- Supply and install 1 HPE Aruba 50G SFP56 to SFP56 3m Direct Attach Copper Cable
- Supply and install 6 HPE Aruba X372 54VDC 1050W Power Supplies
- Supply and install 6 HPE Aruba X372 54VDC 1050W Power Supplies with U.S. power cord
- Supply and install 2 HPE Aruba X372 54VDC 680W Power Supplies
Steps to Bid
- 1
Review the RFP document (22929276-FY2027_C2_Bremen_RFP_.pdf) for full scope details, including equipment specifications, technical requirements, and response format.
- 2
Submit technical questions to Melissa Miller, Chief Technology Officer, by 2:00 PM local time on November 30, 2026, via email at [email available with Pro]. by Nov 30, 2026, 2:00 PM
- 3
Check the Universal Service (E-Rate) website for any addenda or clarifications to the RFP or Form 470.
- 4
Prepare a detailed proposal including line-item pricing, equivalent product technical descriptions, company certifications, two references, E-Rate SPIN number, and a ready-to-execute contract.
- 5
Submit the complete proposal via email to Melissa Miller, Chief Technology Officer, at [email available with Pro] by 2:00 PM local time on December 29, 2026. by Dec 29, 2026, 2:00 PM
What you'll need
Contract duration
The earliest allowable contract date is 2026-12-11. The project is contingent on E-Rate funding approval.
Submission
NAICS
541512, 541513, 541519
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project includes two distinct scopes: Project 1 (Core Switch) and Project 2 (ER Network Rack Overhaul). power cord, 2 HPE Aruba X372 54VDC 680W Power Supplies, 2 HPE Aruba X372 54VDC 680W Power Supplies with U.S. power cord, 3 HPE Aruba 6300M 32p Smart Rate 5G CL8 8p SFP+ 10G LRM 2p SFP28 25G MACsec 2p SFP56 50G Switches, 1 HPE Aruba CX 6300M 48-port 1GbE Class4 PoE and 4-port SFP56 Switch, 11 HPE Aruba 1G SFP LC SX 500m OM2 MMF Transceivers, 5 HPE Aruba 10G SFP+ LC LR 10km SMF C-class Transceivers, and 4 HPE Aruba 10G SFP+ LC SR 400m OM4 MMF C-class Transceivers. For Project 2, the District requires two (2) Tripp-Lite SR45UBDP or equivalent 4-Post Fully Enclosed Deep Server Racks, including labor for assembly, positioning, anchoring, removal of old racks, pre-migration connection tracing and labeling, unmounting and re-mounting of core/edge networking hardware, rerouting and reinstallation of copper and fiber cabling, rack cable management, patching, configuration, and post-installation connectivity testing. Bidders must include all related software, hardware, mounting brackets, power cables, multi-year licenses, and basic maintenance. Vendors may submit equivalent equipment if functionally similar, compatible with the existing Cisco infrastructure, and interoperable without hardware modification. Proposals must clearly list quantity, manufacturer, part number, description, unit price, and extended price. All costs, including shipping, taxes, surcharges, and contingency fees, must be included. No equipment from companies deemed a national security risk per FCC Order 19-121 may be submitted. Bidders must provide two references from similar installations, including contact information, with at least one within 90 miles.
Key dates
- Questions due
- Nov 30, 2026, 2:00 PM Eastern Time
- Bids due
- Dec 29, 2026
Documents
- 22929379-USAC_FCC_FORM_470_APPLICATION_270003745_CERTIFIED.pdf6 pages
- 22929276-FY2027_C2_Bremen_RFP_.pdf6 pages
Similar bids near Bremen
- Request for Bids - E-Rate FY2027 Form 470: Internet Access and Data Transmission Service - Wa-Nee Community School… · Nappanee · closes Dec 16, 2026
- E-Rate FY2027 Form 470: Network Equipment and Cabling Installation for Goshen Community Schools · Goshen · closes Dec 18, 2026
- Request for Proposals – Network Equipment Supply and Installation: Switches, Wireless Access Points, and… · South Bend · closes Dec 28, 2026
- Request for Bids - E-Rate FY2027 Form 470: Switches and Necessary Software and Licenses; Switches; Antennas,… · Goshen · closes Dec 31, 2026
- Marian High School Internet Access and Data Transmission Service – E-Rate FY2027 · Mishawaka · closes Jan 6, 2027
Closing soon near Bremen
- Call 2027 Community Crossings Project — South Elkhart, North Elkhart, and West Wabash Avenues, Wakarusa, IN · Wakarusa · closes Nov 30, 2026
- 2027 Community Crossings Project Race Street: Pavement Improvement and Infrastructure Upgrades · New Carlisle · closes Dec 1, 2026
- Notice to Bidders – CHS Fieldhouse BP #2 · Elkhart · closes Dec 3, 2026
- Call 2027 Community Crossings Project · Bourbon · closes Dec 4, 2026
- Winona Lake Canal Street Lift Station Rehabilitation Project · Winona Lake · closes Dec 4, 2026