Resurfacing, ADA Ramps Improvement, and Structural Maintenance on US 285 at W. & E. Hampden Avenue, Arapahoe County, CO
Colorado DOT — Region 1Arapahoe, Colorado#NHPP 2854-156 (25509)
This is a construction solicitation for resurfacing US 285 from S. Federal to S. Dahlia in Arapahoe County, Colorado. Scope includes stone matrix asphalt resurfacing, ADA ramp improvements, and structural maintenance. The bid is due December 3, 2026, at 11:59 PM MT. The project manager is Hsu Cheng, contactable at (303) 512-5453.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 3, 2026, 11:59 PM Mountain Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 3
Scope of work
- Improve ADA ramps at intersections
- Perform structural maintenance on bridges and culverts
- Replace and repair curb and gutter sections
- Install traffic control and signage
Steps to Bid
- 1
Register with CDOT's eProcurement portal (Official linkPro) and obtain a vendor ID.
- 2
Review the full bid package, including plans, specifications, and addenda, available at Official linkPro
- 3
Submit questions to Hsu Cheng at (303) 512-5453 or via email by November 20, 2026. was Nov 20, 2026, 11:59 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Attend the pre-bid meeting on November 18, 2026, at 10:00 AM MT at the CDOT Region 1 office, 10000 E. 1st Ave, Denver, CO 80210. was Nov 18, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Mail, Hand delivery
NAICS
237131, 237132, 237133
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Work includes bridge deck repairs, curb and ramp replacements, and traffic control. Delivery method: Design-Bid-Build. Scheduled advertisement date: November 5, 2026. Project number: NHPP 2854-156 (25509).
Key dates
- Pre-bid meeting
- Nov 18, 2026, 10:00 AM Mountain Time
- Bids due
- Dec 4, 2026
Documents
- CY_2026_Anticipated_Project_Advertisements.pdf6 pages
- GO_Sheet.pdf5 pages
- CDOTPlanHolders.pdf13 pages
More from this agency
- Signal Upgrade and Intersection Improvements at US 287 & Main, US 287 & Chase, Broomfield County, Colorado · closes Dec 4, 2026
- Resurfacing State Highway 79 from Milepost 1.6 to Milepost 4.1, Adams County, Colorado · closes Dec 4, 2026
- Mill/Overlay, ADA Updates, Bridge Work on WB US6 to WB I70 - Jefferson County, CO · closes Dec 4, 2026
- Culvert Rehabilitation Across Region 4 (MP 24.7-24.9) · closes Dec 11, 2026
- HMA Resurfacing, Guardrail, and Pavement Markings on SH 114 West of Saguache · closes Dec 11, 2026