Resurfacing on I-40 from Falling Water River to the Ramp from U.S. 70N (S.R. 24) - Putnam County
Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN262079
23.96) to the ramp from U.S. 70N (S.R. 24) (L.M. 33.33) in Putnam County. Bids must be submitted electronically via Bid Express by 10:00 A.M. Central on December 4, 2026. Contractors must be in good standing with the Tennessee Secretary of State. A 5% bid bond is required, submitted electronically. A mandatory pre-bid meeting is scheduled for November 17, 2026, at 2:00 PM EST (1:00 PM CST) at the Region 4 Auditorium, 300 Benchmark Place, Jackson, TN 38301. Attendance is mandatory for prime/joint venture contractors seeking authorization to bid.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- internet
- Documents analyzed
- 2
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Resurface 9.370 miles of I-40 from Falling Water River (L.M. 23.96) to the ramp from U.S. 70N (S.R. 24) (L.M. 33.33)
- Completion by August 31, 2026
Steps to Bid
- 1
Obtain bid authorization via the Bid Express website by 4:00 PM Central the day before the letting. by Dec 3, 2026, 4:00 PM
- 2
Submit a bid via the internet (Bid Express) by 10:00 AM Central on December 4, 2026. by Dec 4, 2026, 10:00 AM
- 3
Attend the mandatory pre-bid meeting on November 17, 2026, at 2:00 PM EST (1:00 PM CST) at the Region 4 Auditorium, 300 Benchmark Place, Jackson, TN 38301. was Nov 17, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Ensure the bid is accompanied by an electronic bid bond equal to 5% of the bid amount. by Dec 4, 2026, 10:00 AM
What you'll need
Contract duration
On or before 8/31/2026
Submission
Internet
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Contract No. CN262079, Call No. 041 - Putnam County Project No. NH-I-40-6(196), 71I040-F8-015 (PIN 136556.00): The resurfacing on I-40 from Falling Water River (L.M. 23.96) to the ramp from U.S. 70N (S.R. 24) (L.M. 33.33). Project Length - 9.370 miles. Completion Time - On or before 8/31/2026 (See Special Provision 108B). Internet bidding mandatory. Bid authorization obtainable until 4:00 P.M. Central the day before the letting.
Key dates
- Pre-bid meeting
- Nov 17, 2026, 2:00 PM Central Time
- Bids due
- Dec 4, 2026, 10:00 AM CT
Documents
- 20261204_NoticeToContractors.pdf14 pages
- 20261204_InstructionsToBidders.pdf4 pages
More from this agency
- Grading, Drainage, Signals, and Paving on U.S. 411 (S.R. 33) at Niles Ferry Road / Church Street Intersection, Monroe… · closes Dec 4, 2026
- Resurfacing on U.S. 41 (S.R. 11) from near Gospel Street to near the Montgomery County line - Robertson County · closes Dec 4, 2026
- Resurfacing on I-40 from Fletcher Creek to near Davies Plantation Road, including bridge expansion joint repair and… · closes Dec 4, 2026
- Resurfacing on S.R. 56 from south of S.R. 135 to east of S.R. 151, including bridge expansion joint repair - Jackson… · closes Dec 4, 2026
- Resurfacing on I-24 from South of Wattendorf Memorial Highway to Near Prairie Plains Road, Coffee County · closes Dec 4, 2026
Similar bids in Tennessee
- Educational Greenhouse Construction and Installation at Lexington High School
- Green McAdoo Gym Floor Replacement · closes Dec 10, 2026
- SCCF Domestic Water Piping Replacement Phase 2 · closes Dec 2, 2026
- Exterior Renovations at Development TN037-001 & 002 · closes Dec 16, 2026
- Redevelopment of 18-Acre Site · closes Dec 9, 2026
Closing soon in Tennessee
- Supply and Deliver DC and AC Preferred Systems for USACE-LRN · closes Nov 30, 2026
- Youth Justice and Education Center Renovation/Construction · closes Nov 30, 2026
- Medicaid Alternative Pathways to Independence (MAPs) Housing Milestone Development – Request for Information · closes Nov 30, 2026
- Project Management and Engineering Services for PHMSA Natural Gas Distribution Infrastructure Safety and Modernization… · closes Dec 1, 2026
- Network Transformers — RFQ #1810265 · closes Dec 1, 2026