Resurfacing on I-24 from South of Wattendorf Memorial Highway to Near Prairie Plains Road, Coffee County
Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN262072
20.79) to near Prairie Plains Road (L.M. 24.79). The project must be completed by September 30, 2027. Bids must be submitted electronically via Bid Express by 10:00 A.M. Central Time on December 4, 2026. Bid authorization must be obtained by 4:00 P.M. Central the day before the letting. Contractors must be in good standing with the Tennessee Secretary of State. The contract will be awarded within 30 days after bid opening.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Submission
- internet
- Documents analyzed
- 2
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Resurface 4.000 miles of I-24 in Coffee County
- Work from south of Wattendorf Memorial Highway (L.M. 20.79) to near Prairie Plains Road (L.M. 24.79)
Steps to Bid
- 1
Obtain bid authorization via the TDOT Construction Division website by 4:00 P.M. Central the day before the letting. by Dec 3, 2026, 4:00 PM
- 2
Download and review the full bid package, including plans, specifications, and special provisions, from the TDOT Construction Division website.
- 3
Submit a bid via the Bid Express website by 10:00 A.M. Central Time on December 4, 2026. by Dec 4, 2026, 10:00 AM
What you'll need
Contract duration
On or before 9/30/2027
Submission
Internet
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Contract No. CN262072, Call No. 011 - Coffee County Project No. NH-I-24-2(200), 16I024-F8-009 (PIN 128856.00): Resurfacing on I-24 from south of Wattendorf Memorial Highway (L.M. 20.79) to near Prairie Plains Road (L.M. 24.79). Completion time: On or before 9/30/2027 (See Special Provision 108B). Internet bidding is mandatory. The Department will not execute contracts with entities not in good standing.
Key dates
- Bids due
- Dec 4, 2026, 10:00 AM CT
Documents
- 20261204_NoticeToContractors.pdf14 pages
- 20261204_InstructionsToBidders.pdf4 pages
More from this agency
- Resurfacing on S.R. 20 from U.S. 412 (S.R. 99) to near Napier Road - Lewis County · closes Dec 4, 2026
- Resurfacing on S.R. 30 from Cottonport Road to the Meigs County Line, Rhea County · closes Dec 4, 2026
- Crack Sealing on Various Interstate and State Routes — Dickson, Lawrence, Lincoln, Rutherford, Stewart, Sumner, and… · closes Dec 4, 2026
- Resurfacing on S.R. 99 from near U.S. 31 (S.R. 6, Nashville Highway) to near I-65 - Maury County · closes Dec 4, 2026
- Resurfacing on S.R. 174 from Davidson County Line to Buchanan Circle, Including Bridge Expansion Joint Repair and Thin… · closes Dec 4, 2026
Similar bids in Tennessee
- Request for Qualifications: ARFF Airfield Access Concrete Apron Reconstruction, Nashville International Airport · closes Dec 3, 2026
- Resurfacing of Town Streets with Asphalt — Town of Summitville
- Resurfacing on U.S. 412 (S.R. 20) from Thomas Road to S.R. 22, Including Bridge Expansion Joint Repairs — Henderson… · closes Dec 4, 2026
- Resurfacing on S.R. 52 from East of Ranch Road to West of S.R. 259, Sumner County · closes Dec 4, 2026
- Amos Road Wet Weather Pump Station and Storage Basin · closes Dec 3, 2026
Closing soon in Tennessee
- Youth Justice and Education Center Renovation/Construction · closes Nov 30, 2026
- Medicaid Alternative Pathways to Independence (MAPs) Housing Milestone Development – Request for Information · closes Nov 30, 2026
- Project Management and Engineering Services for PHMSA Natural Gas Distribution Infrastructure Safety and Modernization… · closes Dec 1, 2026
- Resurfacing on I-40 from near S.R. 53 to the bridge over the Caney Fork River, Smith County · closes Dec 4, 2026
- Purchase of XGSPON (Gigabit Passive Optical Network) Equipment · closes Dec 4, 2026