Resurfacing on S.R. 227 from the Alabama State Line to May Branch Loop, Wayne County, Tennessee
Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN263086
0.00) to May Branch Loop (L.M. 4.00). The project must be completed by July 31, 2027. Bids are due via the internet through Bid Express by 10:00 A.M. Central Time on December 4, 2026. Contractors must be in good standing with the Tennessee Secretary of State. A bid bond of 5% of the bid amount is required. The Standard Specifications for Road and Bridge Construction, dated April 1, 2026, are mandatory.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- internet
- Documents analyzed
- 2
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Resurface 4.000 miles of S.R. 227 from Alabama state line (L.M. 0.00) to May Branch Loop (L.M. 4.00)
- Complete work by July 31, 2027
- Provide 5% bid bond electronically
- Submit Bidders List by December 9, 2026
Steps to Bid
- 1
Submit a bid via the Bid Express website by 10:00 A.M. Central Time on December 4, 2026. by Dec 4, 2026, 10:00 AM
- 2
Submit an electronic bid bond of 5% of the bid amount via Bid Express. by Dec 4, 2026, 10:00 AM
What you'll need
Contract duration
On or before July 31, 2027
Submission
Internet
NAICS
237130, 237199
How to submit
Bids must be submitted via the Bid Express website. The bid bond must be submitted electronically via the same platform. All documents must be uploaded through the electronic bidding system.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Contract No. CN263086, Call No. 058 — Wayne County Project No. STP-227(11), 91S227-F8-003 (PIN 135051.00). Resurfacing on State Route 227 from the Alabama State line (L.M. 0.00) to May Branch Loop (L.M. 4.00), total length 4.000 miles. Completion time: On or before July 31, 2027. Internet bidding is mandatory. Bidders must obtain bid authorization by 4:00 P.M. Central the day before the letting.
Key dates
- Bids due
- Dec 4, 2026, 10:00 AM CT
Documents
- 20261204_NoticeToContractors.pdf14 pages
- 20261204_InstructionsToBidders.pdf4 pages
More from this agency
- Resurfacing on S.R. 52 from the Sumner County line to near Old Highway 52 - Macon County · closes Dec 4, 2026
- Resurfacing on I-40 from the Madison County line to near MM 100.4, including bridge expansion joint repair and thin… · closes Dec 4, 2026
- Resurfacing on I-40 from near MM 9.31 to near Macon Road, Shelby County, TN · closes Dec 4, 2026
- Resurfacing on I-81 from Jefferson County Line to Near Exit 12, Hamblen County · closes Dec 4, 2026
- Installation of signals on S.R. 25 (Dixon Springs Highway) at the intersection of Industrial Drive in Carthage - Smith… · closes Dec 4, 2026
Similar bids in Tennessee
- Pole Barn Construction — Invitation to Bid · closes Dec 3, 2026
- WWII Hangar Renovation – Bid Schedules A, B, and C · closes Dec 11, 2026
- Student Center Building Envelope and Interior Renovations · closes Dec 16, 2026
- Hickory Hill Service Center Renovations — Contract No. 12705 · closes Jan 19, 2027
- Vacuum Heat Treating and Brazing Furnace · closes Nov 30, 2026
Closing soon in Tennessee
- Bond Counsel Legal Services (Issuer Credit Rating and Bond Program) · closes Nov 30, 2026
- Security Consulting Services · closes Dec 1, 2026
- SCCF Domestic Water Piping Phase 2, South Central Correctional Facility, Clifton, Wayne County, Tennessee · closes Dec 2, 2026
- Custodial Services · closes Dec 3, 2026
- Timber Harvesting and Logging Services at Smith County Landfill · closes Dec 4, 2026