Resurfacing on S.R. 52 from East of Ranch Road to West of S.R. 259, Sumner County
Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN263084
7.50) to west of S.R. 259 (L.M. 12.01) in Sumner County. The project spans 4.510 miles and must be completed by August 31, 2027. Bids are due via the internet (Bid Express) by 10:00 A.M. Central on December 4, 2026. Internet bidding is mandatory. Bidders must obtain bid authorization by 4:00 P.M. Central the day before the letting.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- internet
- Documents analyzed
- 2
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Resurface 4.510 miles of S.R. 52 from east of Ranch Road to west of S.R. 259
- Complete work by August 31, 2027
- Provide a list of subcontractors who provided quotes within 5 days of bid submission
Steps to Bid
- 1
Review all addenda posted on the Bid Express website. Bidders must acknowledge receipt of all addenda by 2:00 P.M. Central the day before the letting. by Dec 3, 2026, 2:00 PM
- 2
Submit the bid electronically via the Bid Express website by 10:00 A.M. Central on December 4, 2026. by Dec 4, 2026, 10:00 AM
- 3
Submit the electronic bid bond (5% of the bid amount) via the Bid Express system by the same deadline. by Dec 4, 2026, 10:00 AM
What you'll need
Contract duration
On or before 8/31/2027
Submission
Internet
NAICS
237130, 237199
How to submit
Bids must be submitted electronically via the Bid Express website. The electronic bid bond must be submitted through the same system. All documents, including the Bidders List, must be submitted electronically.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Contract No. CN263084, Call No. 055 - Sumner County Project No. NH/HSIP-52(116), 83S052-F8-003 (PIN 136325.00), 83S052-F3-003 (PIN 136325.00): The resurfacing on S.R. 52 from east of Ranch Road (L.M. 7.50) to west of S.R. 259 (L.M. 12.01). Completion Time - On or before 8/31/2027 (See Special Provision 108B). Failure to do so results in non-responsiveness.
Key dates
- Questions due
- Dec 3, 2026, 4:00 PM Central Time
- Bids due
- Dec 4, 2026, 10:00 AM CT
Documents
- 20261204_NoticeToContractors.pdf14 pages
- 20261204_InstructionsToBidders.pdf4 pages
More from this agency
- Resurfacing on I-81 from the Greene County line to the Sullivan County line, Washington County, Tennessee · closes Dec 4, 2026
- Resurfacing on U.S. 70S (S.R. 1) from near Hollis Creek Road to near Mears Drive, Cannon County · closes Dec 4, 2026
- Resurfacing (microsurface or thin mix overlay) from S.R. 52 (L.M. 10.56) to the Kentucky State line (L.M. 20.09),… · closes Dec 4, 2026
- Resurfacing on U.S. 51 (S.R. 3) from Sylvan Road to Ramp 17C to S.R. 77, including bridge expansion joint repair and… · closes Dec 4, 2026
- Microsurfacing on S.R. 39 from near County Road 469 to S.R. 310, McMinn County, TN · closes Dec 4, 2026
Similar bids in Tennessee
- Amos Road Wet Weather Pump Station and Storage Basin · closes Dec 3, 2026
- 2026 BCUD Asphalt Plant Natural Gas Extension · closes Dec 3, 2026
- Grading, Drainage, and Paving on U.S. 25W (S.R. 9) at Intersection of West Beaver Creek Drive, Knox County · closes Dec 4, 2026
- Grading, Drainage, Retaining Wall Construction, and Paving on U.S. 127 (S.R. 8) from S.R. 27 (Suck Creek Road) to… · closes Dec 4, 2026
- Project No. 2731, ARFF Airfield Access Concrete Apron Reconstruction · closes Dec 3, 2026
Closing soon in Tennessee
- Indoor Softball Practice Facility Construction — Lewis County High School, Hohenwald, TN · closes Dec 1, 2026
- DBHS CTE Cosmetology Classroom Relocation · closes Dec 1, 2026
- Roof Replacement at Development TN053-007 · closes Dec 2, 2026
- Wastewater Pump Station Upgrade on S.R. 321 (Hwy 11E) · closes Dec 3, 2026
- CDBG – Disaster Recovery Housing Rehabilitation and Reconstruction Program Administration Services · closes Dec 3, 2026